Germany: projects and investment
Germany plans to phase out coal-fired electricity generation by 2038 at the latest and aims for renewables to supply at least 80% of gross electricity consumption by 2030.
The IS-04Z1 is an eigensicheres Smartphone designed to ATEX 2014/34/EU for Zone 1 and Zone 21, built for the chemical parks, refineries and pharmaceutical plants where most German Ex-Schutz work happens. Germany imported 96% of its petroleum and 89% of its natural gas in 2025, and imports covered 65.6% of its total energy needs, so ports, pipelines and storage terminals are central. Distribution partners for Germany are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Germany has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Germany: Marl, Frankfurt Höchst, Burghausen | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Germany. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Germany market guide.
Germany plans to phase out coal-fired electricity generation by 2038 at the latest and aims for renewables to supply at least 80% of gross electricity consumption by 2030.
Domestic hard coal production ended in 2018, so all hard coal is imported, adding port coal-handling and rail-transfer sites to Germany's dust-hazard areas.
Lignite is mined in the extreme west and east, mainly in North Rhine-Westphalia, Saxony and Brandenburg, and burned in plants near the mines, so dust and fuel-handling hazards cluster in those regions.
In 2025 transport accounted for about 31% of energy consumption, households 28% and industry 26%, so fuel distribution and storage form a large part of the infrastructure.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Germany. A German marking check would compare the device's category, gas group, dust capability and temperature class with the zone documentation for each plant. Chemical-park gas service can involve hydrogen and other groups, so IIC capability helps. The IS-04Z1 target is II 2 G Ex ib IIC T4, and it remains a target until certification is complete.
A distributor for Germany would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
The market guide for Germany covers Ludwigshafen, Leverkusen, Marl, Frankfurt Höchst, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Germany.
Germany applies ATEX Directive 2014/34/EU for equipment and the employer-side Directive 1999/92/EC through national workplace law. Devices for Zone 1 and Zone 2 should carry CE and Ex markings with German-language instructions. Individual plants usually add their own device approval rules.
Typically the EU declaration of conformity, the ATEX or IECEx certificate, the Ex marking details and instructions in German. The operator's explosion protection document defines the zones. Provide a clear device marking photo so the site's inspector can match it to the zone.
Chemical park operators generally set contractor rules, including which devices are permitted in each zone. Requirements differ between parks. Ask the site operator about device approval, permits and registration, and about any managed-device policy, before bringing a handset to site.
More on Germany, and on other places in Germany.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.