Germany: logistics and access
Germany imported 96% of its petroleum and 89% of its natural gas in 2025, and imports covered 65.6% of its total energy needs, so ports, pipelines and storage terminals are central.
The IS-04Z1 is an eigensicheres Smartphone designed to ATEX 2014/34/EU for Zone 1 and Zone 21, built for the chemical parks, refineries and pharmaceutical plants where most German Ex-Schutz work happens. This page sets out how a hazardous area mobile phone supply route to Germany will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. A hazardous area mobile phone for Germany cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Germany: Burghausen, Karlsruhe, Ludwigshafen | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Germany. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Germany market guide covers.
Germany imported 96% of its petroleum and 89% of its natural gas in 2025, and imports covered 65.6% of its total energy needs, so ports, pipelines and storage terminals are central.
Domestic hard coal production ended in 2018, so all hard coal is imported, adding port coal-handling and rail-transfer sites to Germany's dust-hazard areas.
Lignite is mined in the extreme west and east, mainly in North Rhine-Westphalia, Saxony and Brandenburg, and burned in plants near the mines, so dust and fuel-handling hazards cluster in those regions.
In 2025 transport accounted for about 31% of energy consumption, households 28% and industry 26%, so fuel distribution and storage form a large part of the infrastructure.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Germany. German classified areas include chemical parks, refineries such as Karlsruhe and Schwedt, pharmaceutical plants, and LNG terminals at Wilhelmshaven and Brunsbüttel. The operator sets and documents each zone for gas and for dust. SAMS does not classify any area; the device is designed for Zone 1 and Zone 21.
Nothing can be bought for Germany today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
The market guide for Germany covers Ludwigshafen, Leverkusen, Marl, Frankfurt Höchst, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Germany applies ATEX Directive 2014/34/EU for equipment and the employer-side Directive 1999/92/EC through national workplace law. Devices for Zone 1 and Zone 2 should carry CE and Ex markings with German-language instructions. Individual plants usually add their own device approval rules.
Typically the EU declaration of conformity, the ATEX or IECEx certificate, the Ex marking details and instructions in German. The operator's explosion protection document defines the zones. Provide a clear device marking photo so the site's inspector can match it to the zone.
Chemical park operators generally set contractor rules, including which devices are permitted in each zone. Requirements differ between parks. Ask the site operator about device approval, permits and registration, and about any managed-device policy, before bringing a handset to site.
Other guides for Germany, other places in Germany, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.