Jordan: projects and investment
Modern renewables made up 10% of final energy consumption in 2020, up from 3% in 2015, and developers sell power to the National Electric Power Company, so solar and wind construction is increasing.
The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in Jordan every shift: potash and phosphate plant operators, refinery crews at Zarqa, port operators at Aqaba, and the HSE and telecoms teams who equip them. Buyers searching for an ATEX and IECEx smartphone supplier for Jordan can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An ATEX and IECEx smartphone for Jordan cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Jordan: Aqaba, Amman, Dead Sea works | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jordan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Jordan market guide.
Modern renewables made up 10% of final energy consumption in 2020, up from 3% in 2015, and developers sell power to the National Electric Power Company, so solar and wind construction is increasing.
In 2021 Jordan's total energy supply was 51% oil, 38% gas, 3% coal and 8% renewables, so fuel storage, gas networks and power stations form its main flammable-materials infrastructure.
The Arab Potash Company holds a concession to 2058 to extract Dead Sea minerals, has its main plants at Ghor Al Safi, and is the eighth-largest potash producer worldwide.
The Jordan Petroleum Refinery Company's activities include refining, filling gas cylinders, a lubricant factory and fuel marketing through JoPetrol, so one operator spans several hazardous-area process types.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Jordan. A Jordanian reviewer would expect IECEx evidence and JSMO conformity, which the sheet lists as in progress. ATEX evidence also helps international contractors working at Aqaba and the mining sites. A dual route lets one pack serve the operator and visiting teams. No certificate has been issued yet.
There is no stock to order for Jordan yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Jordan covers Dead Sea works, Eshidiya, Al-Hasa and Al-Abiad, Zarqa, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Operators commonly work to IEC 60079 and accept ATEX or IECEx certificates, but acceptance is set by each site's own procedure. Ask the operator's HSE team for its approved equipment list and provide certificates, marking details and manufacturer instructions with your request.
The Zarqa refinery, run by the Jordan Petroleum Refinery Company, is the best-known, with refining, LPG filling and lubricants activity. Expansion and modernisation projects are planned or under way, so contractors work there. Confirm current access rules and device approvals with the company.
The market guide says Jordan's heaviest classified-area exposure is dust, at potash and phosphate sites, with gas at the refinery and Aqaba. Which applies depends on the area. Ask the operator for the zone classification, covering both dust and gas, before choosing a device.
Related guides for Jordan and for Jordan.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.