Mature field
Duri has been steamflooded since 1985 and is described as one of the world's largest steamflood developments, so work is mostly maintenance of existing facilities.
Pekanbaru is the capital of Riau province on Sumatra and the regional base for the Rokan block, a 6,220 square kilometre oil area including the Minas, Duri and Bekasap fields. PT Pertamina Hulu Rokan has operated it since 9 August 2021. This page explains what to look for in an ATEX and IECEx smartphone for Pekanbaru and the Rokan block, Riau, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Pekanbaru and the Rokan block, Riau: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Pekanbaru and the Rokan block, Riau: Gathering stations, Wellheads and flowlines, Oil treatment and storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pekanbaru Oil Field. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Duri has been steamflooded since 1985 and is described as one of the world's largest steamflood developments, so work is mostly maintenance of existing facilities.
The block passed from Chevron's Indonesian subsidiary to PT Pertamina Hulu Rokan in 2021, after about 70 years, so procurement follows Pertamina group processes.
The Duri field, discovered in 1941 and in production from 1954, covers 67.28 sq km in Riau and has produced more than 2.75 billion barrels, making it one of Indonesia's largest and most productive fields.
The previous operator drilled 16,023 wells across four blocks, including the Rokan block and the Coastal Plain Pekanbaru block, so a very dense network of wellheads, flowlines and facilities exists around the city.
Duri's thick crude is produced with steamflood enhanced oil recovery, introduced successfully by 1985, which lifted output to about 302 thousand barrels a day by 1995 and means hot steam systems run beside oil handling.
Indonesian is the official language in Pekanbaru, while Minangkabau is widely used in markets and daily business, and Riau Malay and Javanese are also commonly spoken, so site teams are often multilingual.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Pekanbaru and the Rokan block, Riau. A reviewer on the Rokan block would expect certificate evidence matched to the marking, with its schedule of conditions. The IS-04Z1 evidence is in progress. A dual ATEX and IECEx route helps because maintenance and service contractors working with PT Pertamina Hulu Rokan often come from international oilfield backgrounds.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are gathering stations, wellheads and flowlines, oil treatment and storage, steam generation and power facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Steamflood means hot steam lines and wells operate close to oil and gas handling, so surface temperatures can be higher than at conventional wells. Handheld devices should respect the site's temperature limits and classification, so ask the operator for its rules on portable electronics.
The Rokan block, including the Minas and Duri fields, has been run by Pertamina Hulu Rokan since August 2021. Contractors and suppliers typically register through Pertamina's vendor processes and follow the site's own induction and permit rules, so confirm current requirements.
Suppliers are normally approved by the operator and its contractors, following Pertamina group processes since the 2021 operator change. Ask PT Pertamina Hulu Rokan about current registration requirements before offering any equipment. Confirm with the site operator.
Other guides for Pekanbaru Oil Field, other places in Indonesia, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.