PDO: who works there
PDO is owned 60 per cent by the Government of Oman, 34 per cent by Shell, 4 per cent by TotalEnergies and 2 per cent by Partex, and employs more than 9,000 people.
Petroleum Development Oman (PDO) is Oman's main oil and gas producer, operating a concession of about 90,000 square kilometres. The Government of Oman holds 60 per cent, Shell 34, TotalEnergies 4 and Partex 2. This page explains what to look for in an ATEX and IECEx smartphone for PDO, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for PDO: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | PDO: Wellheads and flowlines, Gas processing plants, Oil production and gathering stations | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Oman. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
Joint Supplier Registration System (JSRS) certification from the Ministry of Energy and Minerals is a prerequisite before suppliers can be qualified by PDO; PDO's website has a Vendor Corner for registration. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
PDO is owned 60 per cent by the Government of Oman, 34 per cent by Shell, 4 per cent by TotalEnergies and 2 per cent by Partex, and employs more than 9,000 people.
A 276 kilometre pipeline from the interior fields to the coast was laid in the 1960s, ending at an industrial complex, tank farm and marine terminal at Mina al Fahal near Muscat.
PDO's headquarters are at Mina Al Fahal in Muscat, and supplier guides say firms generally cannot bid on PDO tenders without prior vendor registration and approval.
PDO's name was shortened to Petroleum Development (Oman) in 1951 after the Dhofar concession lapsed, and the company later operated as Petroleum Development Oman from 1967.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In PDO. A PDO procurement or HSE reviewer would expect certificate evidence tied to the exact equipment and zone, not a brochure claim. Across a concession of about 90,000 square kilometres, a dual ATEX and IECEx route would help contractors who arrive with approvals from several jurisdictions. The IS-04Z1 certification is in progress and no certificate has been issued.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Joint Supplier Registration System (JSRS) certification from the Ministry of Energy and Minerals is a prerequisite before suppliers can be qualified by PDO; PDO's website has a Vendor Corner for registration.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typically at wellsites, production stations and gas processing plants in the interior concession area, and at the Mina al Fahal coastal terminal and tank farm. The operator issues the hazardous-area classification for each facility, so ask for the zone, gas group and temperature class before selecting equipment.
PDO is the largest onshore exploration and production company and delivers most of Oman's crude oil and gas supply, but other operators and OQ's refining and petrochemical businesses also run hazardous-area sites. Each organisation sets its own supplier and equipment rules, so confirm with the one that controls your site.
The IS-04Z1 is IP68 rated against dust and water and carries a 4,000 mAh battery, but ambient temperature limits will come from the final certificate and datasheet. Do not assume operation beyond the stated temperature range. IP68 is not explosion protection. Check the temperature class against the area before use.
Related guides for PDO and for Oman.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.