PDO: infrastructure
A 276 kilometre pipeline from the interior fields to the coast was laid in the 1960s, ending at an industrial complex, tank farm and marine terminal at Mina al Fahal near Muscat.
PDO delivers the majority of Oman's crude oil production and natural gas supply, making it the dominant operator for onshore exploration and production in the Sultanate. The Government of Oman holds 60 per cent, Shell 34, TotalEnergies 4 and Partex 2. If you are specifying an IECEx mobile phone for PDO, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for PDO: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | PDO: Wellheads and flowlines, Gas processing plants, Oil production and gathering stations | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Oman. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
Joint Supplier Registration System (JSRS) certification from the Ministry of Energy and Minerals is a prerequisite before suppliers can be qualified by PDO; PDO's website has a Vendor Corner for registration. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
A 276 kilometre pipeline from the interior fields to the coast was laid in the 1960s, ending at an industrial complex, tank farm and marine terminal at Mina al Fahal near Muscat.
PDO's headquarters are at Mina Al Fahal in Muscat, and supplier guides say firms generally cannot bid on PDO tenders without prior vendor registration and approval.
PDO's name was shortened to Petroleum Development (Oman) in 1951 after the Dhofar concession lapsed, and the company later operated as Petroleum Development Oman from 1967.
The first commercially significant oil find came at Yibal in April 1962, followed by Natih in 1963 and Fahud, and the first export cargo left Oman on 27 July 1967.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In PDO. IECEx is the route most visiting international contractors know, which matters in a producer whose partners include international energy companies. A reviewer would look for the certificate of conformity and its schedule of conditions, then compare the stated gas group, temperature class and equipment protection level with the job. The IS-04Z1 IECEx file is still in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Joint Supplier Registration System (JSRS) certification from the Ministry of Energy and Minerals is a prerequisite before suppliers can be qualified by PDO; PDO's website has a Vendor Corner for registration.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typically at wellsites, production stations and gas processing plants in the interior concession area, and at the Mina al Fahal coastal terminal and tank farm. The operator issues the hazardous-area classification for each facility, so ask for the zone, gas group and temperature class before selecting equipment.
PDO is the largest onshore exploration and production company and delivers most of Oman's crude oil and gas supply, but other operators and OQ's refining and petrochemical businesses also run hazardous-area sites. Each organisation sets its own supplier and equipment rules, so confirm with the one that controls your site.
The IS-04Z1 is IP68 rated against dust and water and carries a 4,000 mAh battery, but ambient temperature limits will come from the final certificate and datasheet. Do not assume operation beyond the stated temperature range. IP68 is not explosion protection. Check the temperature class against the area before use.
More on PDO, and on other places in Oman.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.