Mossmorran
Shell's Fife NGL plant separates natural gas liquids. ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned, so activity there is shifting to closure work.
Scotland has a long oil, gas and petrochemical base. Grangemouth Refinery on the Firth of Forth began operating in 1924 and was the only crude oil refinery in Scotland, but it has now closed; its neighbouring petrochemical complex dates from 1951. An ATEX and IECEx smartphone distributor in Scotland would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Scotland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Scotland: Gas terminals, Fuel import and storage terminal, Petrochemical process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Scotland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Shell's Fife NGL plant separates natural gas liquids. ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned, so activity there is shifting to closure work.
The terminal handles roughly a quarter of Britain's gas and sends natural gas liquids to Mossmorran. It is owned by North Sea Midstream Partners, with Shell, Esso and others as tenants.
Hydrocarbon production is expected to fall to about a third of 2019 levels by 2035, and a global decommissioning market of around 67 billion pounds over ten years is forecast, so abandonment work is growing.
Shipbuilding remains significant, generating 403 million pounds of gross value added in 2022, alongside oil and gas, food and drink, energy and manufacturing among Scotland's primary industries.
A 58-mile pipeline from the Finnart oil terminal on Loch Long to Grangemouth has operated since the 1950s, and the Kinneil terminal stabilised North Sea Forties crude from 1975.
The North Sea Transition Authority regulates licensing, and OPRED regulates environmental and decommissioning activity for offshore oil and gas, so offshore work answers to UK regulators rather than Scottish bodies.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Scotland. A reviewer in Scotland would expect certificate evidence tied to the operator's DSEAR assessment at Grangemouth, Mossmorran or St Fergus. With Shell, INEOS and others employing international contractors, a dual ATEX and IECEx route is designed to help. Both certifications remain in progress for SAMS, and none has been issued.
A distributor for Scotland would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are petrochemical process units, natural gas liquids plant, gas terminals, fuel import and storage terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Scotland.
Offshore and coastal sites face wind, rain, salt spray and cold, and winter weather can disrupt crew changes. For handheld devices check ingress protection, corrosion resistance, glove-friendly controls and low-temperature battery behaviour, and ask the platform or terminal for its own requirements.
Aberdeen and the north-east are the centre of offshore oil and gas support, with other activity at the Grangemouth industrial area on the Firth of Forth, east-coast and Shetland terminals, shipyards, distilleries and offshore wind bases. Zoning is site-specific, so ask each operator for classification drawings.
The Grangemouth refinery stopped processing crude in 2025 and is becoming a fuels import terminal, and ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned. Work may therefore shift towards closure and conversion, so ask operators which contractors and requirements apply.
More on Scotland, and on other places in United Kingdom.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.