Far from shore
Pre-salt units are far offshore, so crews and equipment move by helicopter and supply vessel.
The Santos Basin is an offshore province in the South Atlantic, roughly 300 km south-east of Santos, spanning about 352,000 square kilometres and holding major pre-salt fields such as Tupi, Buzios and Mero. Pre-salt reservoirs are ultra-deep carbonates, roughly 5,000 to 7,000 m total depth below a thick salt seal, which drives the high-pressure, high-temperature design of wells and topsides. Distribution partners for Santos Basin are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Santos Basin has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Santos Basin: Gas compression and export, Offloading areas, Platform process modules | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Santos Basin. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Pre-salt units are far offshore, so crews and equipment move by helicopter and supply vessel.
Pre-salt gas reaches the onshore Boaventura plant at Itaborai through the Rota 3 pipeline.
Giant fields found since 2007 include Tupi (about 8 billion barrels), Jupiter (about 1.6 billion barrels and 17 trillion cubic feet of gas) and Libra, estimated at 8 to 12 billion recoverable barrels.
Santos, Guaruja and Ilhabela sit in the central onshore part of the basin, and the city of Rio de Janeiro is on the northern coastal edge, so supply bases cluster along that coast.
Associated gas in some pre-salt fields contains more than 20 percent CO2, which is separated on the FPSO, compressed and reinjected, so gas compression and high-pressure CO2 handling are routine offshore.
The basin is known for thick salt layers that deform into structures in the subsurface, and the pre-salt Tupi reservoir sits in microbialite carbonates of the Guaratiba Group beneath that salt.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Santos Basin. Santos Basin units, run by Petrobras, Shell, Repsol and Eni, are far offshore, so reviewers want certificate evidence verified before equipment is sent. A dual ATEX and IECEx route is designed to help international FPSO contractors. The IS-04Z1 has no certificate yet.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Santos Basin. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are platform process modules, wellhead areas, gas compression and export, offloading areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Santos Basin.
Petrobras is the main operator, often in partnership with other energy companies on licences. Because induction rules and approved-device lists are set per operator and unit, confirm requirements for each asset you will visit.
It is a process condition rather than an Ex rating, but gas detection, procedures and area classification take it into account. Mobile devices still follow the unit's zone rules, so confirm with the operator which markings and approvals the platform accepts.
Not necessarily. Petrobras, Shell, Repsol and Eni each set their own policies for portable devices and approvals. Ask each operator for its Ex equipment policy and the classification of the specific unit. Confirm with the site operator before ordering.
Related guides for Santos Basin and for Brazil.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.