Gas links
Mutual Energy owns the Scotland-Northern Ireland pipeline, the Belfast gas transmission pipeline from Islandmagee, and the Moyle electricity interconnector.
Northern Ireland is a UK region with gas-fired power stations, the Scotland-Northern Ireland gas pipeline landing at Islandmagee and a proposed gas storage cavern project there. Gas for Greater Belfast arrives through the 24-inch Scotland-Northern Ireland pipeline, and a north-west pipeline from Carrickfergus to Derry opened in November 2004, so gas networks and compressor sites sit across the east and north-west. An ATEX and IECEx smartphone distributor in Northern Ireland would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Northern Ireland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Northern Ireland: Gas pressure reduction sites, Fuel storage, Gas-fired power station fuel systems | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Northern Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Mutual Energy owns the Scotland-Northern Ireland pipeline, the Belfast gas transmission pipeline from Islandmagee, and the Moyle electricity interconnector.
Under the Windsor Framework, relevant EU product rules apply in Northern Ireland, so equipment is typically CE marked, with UKNI added where a UK notified body is used.
Machinery and equipment manufacturing, food processing, textile and electronics manufacturing are the leading industries, concentrated mostly in the eastern parts of Northern Ireland around Belfast.
The Belfast yard has sea access through the Victoria Channel with no locks or height restrictions, 24-hour ISPS-approved security, and two airports close by: George Best Belfast City five minutes away and Belfast International under 30 minutes.
Key industries in 2024 include aerospace, agriculture, construction, engineering, health technology and manufacturing, and engineering is the largest manufacturing sub-sector, particularly aerospace and heavy machinery.
The Harland and Wolff shipyard in the Port of Belfast has two of Europe's largest drydocks, with a main dock of 556 m by 93 m, and is licensed for vessel repair and open grit blasting.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Northern Ireland. In Northern Ireland, a reviewer would expect CE marked equipment, because under the Windsor Framework relevant EU product rules apply, with UKNI added where a UK notified body is used. That makes ATEX evidence central. A dual ATEX and IECEx route also helps operators and contractors working across the UK and Ireland. Both certifications are in progress for SAMS.
A distributor for Northern Ireland would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are gas-fired power station fuel systems, gas transmission pipeline assets, gas pressure reduction sites, fuel storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Northern Ireland.
Northern Ireland remains under EU product rules for many goods, so CE and ATEX marking is generally relevant there, while Great Britain uses UKCA. Requirements can change, so confirm with the operator and the certifying body which marking is accepted for portable Ex equipment on your site.
Likely locations include fuel and gas terminals at Belfast harbour, gas network compressor and pressure reduction sites, food and feed plants with dust risks, and shipyard and marine repair work. Zoning is site-specific, so ask the operator for area classification drawings before choosing handheld devices.
Gas-fired power stations such as Ballylumford and Coolkeeragh, the Mutual Energy gas pipeline network from Islandmagee, pressure reduction sites and fuel storage. A proposed gas storage cavern project at Islandmagee has not been confirmed in the sources checked, so ask the operators about project timing.
Related guides for Northern Ireland and for United Kingdom.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.