Nigeria: industry on the ground
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
A Zone 1 / Zone 21 smartphone for crews on Niger Delta flow stations, deepwater FPSOs, export terminals and the refining complexes at Lekki and Eleme. The Niger Delta extends over about 70,000 square kilometres, around 7.5 per cent of Nigeria's land area, between the Bight of Benin and the Bight of Bonny. An ATEX and IECEx smartphone distributor in Nigeria would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Nigeria has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Nigeria: Bonny Island, Lekki Free Zone, Lagos, Eleme, Rivers State | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Nigeria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Nigeria market guide.
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
The Dangote Refinery at Lekki, Lagos was commissioned in May 2023, began operations in January 2024 and has a stated capacity of 700,000 barrels a day.
The Delta states of Bayelsa, Delta and Rivers form the historic core of the region, which is petroleum-rich and has been the centre of international attention for its oil industry.
NCC type approval standards are based on international work from IEC and CISPR, CENELEC and ETSI, and the commission publishes lists of approved handsets and approved equipment.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Nigeria. A Nigerian reviewer at an operator or in a joint venture would expect an IECEx Certificate of Conformity, because IECEx certificates are recognised by operators and regulators across West Africa, and ATEX evidence beside it helps. International companies working here specify to the standards they apply globally. Both programmes are in progress and nothing is yet issued.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Nigeria yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for Nigeria covers Port Harcourt, Rivers State, Warri and Escravos, Bonny Island, Lekki Free Zone, Lagos, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Nigeria.
The Delta is typically a low-lying, hot and humid region with heavy seasonal rain, so corrosion and moisture are common concerns. Check ingress protection, corrosion resistance and the operating temperature range, and ask the operator about site transport, such as boat or helicopter, and device rules.
A large new refinery is operated by its owner, which applies its own site HSE, permit and equipment requirements alongside Nigerian law. Contractors should ask the operator for its induction, permit-to-work and approved-equipment procedures rather than assuming the practices of other Nigerian sites.
The programme lists IECEx for hazardous area use and SONCAP and NCC steps for national conformity and the radio, all in progress. Nothing is yet issued. Ask your supplier and the site operator which documents your procurement and HSE teams will require before purchase.
More on Nigeria, and on other places in Nigeria.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.