Service concentration
With so many contractors based locally, equipment is often bought, prepared and serviced here before shipment offshore.
Macae is a city in the north of Rio de Janeiro state, known as Brazil's national oil capital. Macae is generally considered the centre of Brazil's offshore petroleum industry and is nicknamed Cidade do Petroleo (City of Petroleum), with many Petrobras facilities inside the town. Distribution partners for Macae are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Macae has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Macae: Workshops handling offshore equipment, Onshore oil and gas handling, Offshore supply bases and quays | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Macaé. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
With so many contractors based locally, equipment is often bought, prepared and serviced here before shipment offshore.
Daytime highs average about 28.5 C with around 1,215 mm of rain a year.
Macae Airport now has six helicopter operators meeting the safety standards Petrobras requires, with seven hangars, four shared lounges and a workspace area in the check-in hall.
Since the 1970s, when Petrobras chose Macae as its Campos Basin base, more than 4,000 companies have set up offices there and the population has roughly tripled.
An airport spotting guide reports about 2,000 helicopter operations a month, around 60 to 70 a day, mostly medium and heavy helicopters, plus two daily scheduled airline flights.
A new 1,410 metre runway, a roughly R$220 million investment by the airport concessionaire Zurich Airport Brasil, is being built to let larger aircraft use the airport.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Macae. Macae is where offshore equipment is prepared before it goes to the Campos Basin, so reviewers at Petrobras facilities and service companies will ask for certificate evidence early. A dual ATEX and IECEx route is designed to help international offshore service firms. The IS-04Z1 has no certificate yet.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Macae. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are offshore supply bases and quays, heliport and fuel storage, workshops handling offshore equipment, onshore oil and gas handling. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Macae.
The coast is humid and salty, so expect corrosion and condensation on connectors and cases. Choose sealed housings, rinse and dry equipment after offshore trips, and ask the contractor about storage conditions at the heliport and base.
Courses are delivered by operators, specialised training centres and the city's technical institutions, and platform inductions are set by the operator. Confirm which course certificates your crew need and whether device handling is covered in the induction.
That is a common practice, since equipment is often bought, prepared and serviced here before shipment. Enrolment, configuration and charging can be done onshore in safe areas. Confirm the offshore operator's approval and documentation requirements before sending anything out.
More on Macaé, and on other places in Brazil.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.