Pipeline-fed
Gas arrives from the Montney Formation via the 670 km Coastal GasLink pipeline, built and operated by TC Energy.
LNG Canada is a liquefied natural gas export terminal at Kitimat on the British Columbia coast, with two trains and an initial 14 million tonnes per year. Engineering and construction supervision was awarded to a joint venture of JGC Corporation of Japan and Fluor Corporation, called JGC Fluor, which shaped the contractor structure on site. Distribution partners for LNG Canada, Kitimat are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. LNG Canada, Kitimat has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | LNG Canada, Kitimat: Gas receipt from pipeline, Marine loading jetty, LNG liquefaction trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kitimat LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Gas arrives from the Montney Formation via the 670 km Coastal GasLink pipeline, built and operated by TC Energy.
Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue.
LNG carriers sail up and down the Douglas Channel to the port of Kitimat to load, mainly for Asian markets, using a new carrier terminal connected to the liquefaction and storage plant.
The plant produced its first LNG and shipped its first cargo in June 2025, the second train started in November 2025 and by 23 February 2026 it had shipped 50 cargoes.
Gas arrives via the 670 km Coastal GasLink pipeline built by TC Energy, with an initial capacity of about 2.1 billion cubic feet a day and potential expansion to about 5 billion.
The second phase is an 18 billion dollar liquefaction and storage plant in the port of Kitimat, where natural gas is cooled to liquid and stored awaiting shipment.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In LNG Canada, Kitimat. A reviewer at LNG Canada in Kitimat, a venture of Shell, PETRONAS, PetroChina, Mitsubishi and KOGAS, would expect certificate evidence of the kind common on international LNG projects. A dual ATEX and IECEx route suits a site with an international owner group. The IS-04Z1 is in certification and has no certificate.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for LNG Canada, Kitimat yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are lng liquefaction trains, lng storage and loading, gas receipt from pipeline, marine loading jetty. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for LNG Canada, Kitimat.
It shipped its first cargo in June 2025 and a second train started later that year, so work is moving from construction to operations, with expansion discussed. Confirm the current phase and contractor structure with the owners.
JGC Fluor led engineering and construction, and TC Energy built the Coastal GasLink pipeline. Operations contractors now vary, so confirm the current inductions and approved-device lists with LNG Canada's contractor management team.
The plant produced its first LNG and shipped its first cargo in June 2025, and the second train was reported to begin operating in November 2025. Further trains have been proposed as a possible second phase, so construction and commissioning activity may continue. Confirm current status with the project operator.
Other guides for Kitimat LNG, other places in Canada, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.