Expansion
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan, in Upper Egypt, is home to the KIMA fertiliser company, whose ammonia and urea plant started up in 2020, and to long-established granite quarries. Hydropower contributed 6% of Egypt's electricity in 2025 and wind and solar 7%, while fossil fuels still generated 87%, so Aswan's hydro is a small but visible part of the national mix. Distribution partners for Aswan are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Aswan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Aswan: Ammonia and urea production, Nitric acid and ammonium nitrate handling (under construction), Quarry explosives storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Aswan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan has an extremely dry desert climate and very hot summers, so heat tolerance matters for devices.
The older Aswan Low Dam was completed in 1902 and the High Dam was built 7 km upstream of it, so two generations of dam and power infrastructure sit close together at the first cataract.
Aswan is a busy market and tourist centre and a global winter tourist destination, so hotels, transport and visitors share the city with its industrial and utility sites.
Benban Solar Park, about 40 km north-west of Aswan, has 1.8 GW installed over 37.2 square km in 41 plots, connected through four new substations built by the Egyptian Electricity Transmission Company.
Aswan's granite quarries supplied stone to many ancient monuments and are still operating today, so quarrying, blasting stores and heavy plant add a mining-type hazard profile near the city.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Aswan. A reviewer at the KIMA fertiliser plant in Aswan would expect certificate evidence suited to ammonia and urea production and the nitrate expansion. A dual ATEX and IECEx route helps because the plant was built by international contractors, Tecnimont and Orascom. The IS-04Z1 has no certificate issued.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Aswan yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are ammonia and urea production, nitric acid and ammonium nitrate handling (under construction), quarry explosives storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Aswan.
Equipment usually enters through a major Egyptian port or Cairo airport and then travels by road, rail or a domestic flight to Aswan. Allow time for customs clearance and for any radio-equipment approvals, and agree delivery and on-site storage with the site contact before shipping.
Mostly utility and industrial: the dam and hydroelectric stations, substations, fuel storage and distribution, and the granite quarries. Aswan is not a refinery city, so hazardous zones are limited and site specific. Ask each operator whether any classified areas apply to your task.
Yes. Aswan has an extremely dry desert climate with very hot summers, so heat tolerance and dust are practical concerns. Check the datasheet's operating temperature range, avoid direct sun and keep charging in a shaded safe area. Ask the site operator about local practice in the hottest months.
More on Aswan, and on other places in Egypt.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.