Power stations
Ballylumford, owned by EP UK Investments since 2019, is the region's largest power station and runs on natural gas. Coolkeeragh near Derry is a 400 MW gas-fired plant owned by ESB.
Northern Ireland is a UK region with gas-fired power stations, the Scotland-Northern Ireland gas pipeline landing at Islandmagee and a proposed gas storage cavern project there. Zone 1 work arises at power stations, gas transmission assets and fuel storage. If you are specifying an ATEX and IECEx mobile phone for Northern Ireland, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Northern Ireland: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Northern Ireland: Gas-fired power station fuel systems, Gas transmission pipeline assets, Gas pressure reduction sites | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Northern Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Ballylumford, owned by EP UK Investments since 2019, is the region's largest power station and runs on natural gas. Coolkeeragh near Derry is a 400 MW gas-fired plant owned by ESB.
Mutual Energy owns the Scotland-Northern Ireland pipeline, the Belfast gas transmission pipeline from Islandmagee, and the Moyle electricity interconnector.
The Harland and Wolff shipyard in the Port of Belfast has two of Europe's largest drydocks, with a main dock of 556 m by 93 m, and is licensed for vessel repair and open grit blasting.
Northern Ireland was self-sufficient in food production by 2021 and exported more than half of its meat and crops, so food plants with dust, ammonia refrigeration and flour or feed handling are common.
Gas for Greater Belfast arrives through the 24-inch Scotland-Northern Ireland pipeline, and a north-west pipeline from Carrickfergus to Derry opened in November 2004, so gas networks and compressor sites sit across the east and north-west.
Unemployment was about 1.6% in early 2025, so qualified engineering and maintenance contractors can be hard to book at short notice during shutdown periods.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Northern Ireland. In Northern Ireland, a reviewer would expect CE marked equipment, because under the Windsor Framework relevant EU product rules apply, with UKNI added where a UK notified body is used. That makes ATEX evidence central. A dual ATEX and IECEx route also helps operators and contractors working across the UK and Ireland. Both certifications are in progress for SAMS.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are gas-fired power station fuel systems, gas transmission pipeline assets, gas pressure reduction sites, fuel storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Goods moving between Great Britain and Northern Ireland pass through post-Brexit customs arrangements, which can add paperwork and lead time. For urgent site equipment, plan stock holding in Northern Ireland or the Republic and confirm the current import documentation with your freight forwarder.
Northern Ireland has a mild but wet and windy climate, with frequent rain and salt air near the coast, so sealing, corrosion resistance and condensation tolerance matter more than extreme temperature ratings. Check ingress protection and gasket quality, and ask the site about its own requirements.
Under the Windsor Framework, relevant EU product rules apply in Northern Ireland, so equipment is typically CE marked, with UKNI added where a UK notified body is used. Because rules can change, confirm the current position with the site operator and HSENI guidance.
Related guides for Northern Ireland and for United Kingdom.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.