Scale
The DEWA Jebel Ali complex has a nameplate capacity of about 8.7 GW, and EGA's Jebel Ali operation comprises a 1 million tonne a year smelter with a 2,350 MW power station.
Jebel Ali, south-west of Dubai, combines the DP World port, the Jebel Ali Free Zone, the DEWA power and desalination complex and the EGA aluminium smelter. Gas-fired power generation, fuel storage and chemical warehousing create classified areas across the district. This page explains what to look for in an ATEX and IECEx mobile phone for Jebel Ali, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Jebel Ali: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Jebel Ali: Gas-fired power station fuel systems, Desalination and power plant gas supply, Smelter power-station fuel areas | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jebel Ali. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The DEWA Jebel Ali complex has a nameplate capacity of about 8.7 GW, and EGA's Jebel Ali operation comprises a 1 million tonne a year smelter with a 2,350 MW power station.
Jafza, DP World's flagship free zone, grew from 19 companies in 1985 to over 11,000 today, so access and site rules vary by tenant.
The port is linked to Dubai's expressway system and to the airport cargo village, which makes a four-hour ship-to-aircraft transfer possible for urgent spares.
The port lies about 35 km south-west of Dubai, so teams based in the city face a long road transfer along the coast.
Dubai falls under the federal Telecommunications and Digital Government Regulatory Authority, which accepts European documents and renews certificates every three years.
ENOC Processing Company, a subsidiary of the Dubai government's energy group ENOC, runs the Jebel Ali refinery in Dubai, adding a process plant to the port district.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Jebel Ali. Jebel Ali combines a port, a free zone, the DEWA power and desalination complex and the EGA smelter, so a reviewer would expect certificate numbers, markings and schedules of conditions for devices in gas-fired power and fuel areas. Dual ATEX and IECEx evidence also helps international tenants. The IS-04Z1 certificates are in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are gas-fired power station fuel systems, desalination and power plant gas supply, smelter power-station fuel areas, chemical and fuel warehousing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
The port is connected to the airport cargo village, and its operator notes that a four-hour ship-to-aircraft transfer is possible. That helps when a part must reach a site quickly, but hazardous-area equipment still needs its certification documents and customs paperwork in place.
The port has a container yard of over one million square metres and about 960,000 square metres of open storage, so handsets used there face sun, heat and dust. Choose a sealed device with a stated operating temperature range and ingress protection rating.
Conditions are hot and humid, with summer highs near 40 degrees C. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but heat limits have not been published. Ask for the datasheet, and confirm with the site operator whether outdoor use is expected in peak summer.
More on Jebel Ali, and on other places in United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.