Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Qatargas · ATEX and IECEx

ATEX and IECEx Mobile Phone for Qatargas

Qatargas was established in 1984 and now trades as QatarEnergy LNG, a QatarEnergy company that develops and produces gas from the North Field and operates LNG facilities at Ras Laffan Industrial City. Its upstream assets are in Ras Laffan and its headquarters are in Doha. This page explains what to look for in an ATEX and IECEx mobile phone for Qatargas, and where the IS-04Z1 stands against that list today.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Qatargas, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceMobile Phone
RouteSpecification
WhereQatargas

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Qatargas: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx mobile phone for Qatargas

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesQatargas: LNG liquefaction trains, Offshore facilities, Onshore gas processingClassified by the site operator
Product · Qatar

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Qatar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The organisation · Qatargas

Working with QatarEnergy LNG (formerly Qatargas): sites and classified areas

The main sites and the hazardous-area types a portable device is likely to meet at this organisation.

Sites and areas

  • Ras Laffan Industrial City
  • North Field (offshore and onshore facilities)

Classified areas

  • LNG liquefaction trains
  • Offshore facilities
  • Onshore gas processing
  • Helium production
Supplier approval · Qatargas

How suppliers reach Qatargas

QatarEnergy LNG is part of the QatarEnergy group, whose Supply Management section describes vendor registration through the Mushtaryat Portal (SAP Vendor Code) and a Preferred Manufacturers List; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.

Field notes · Qatargas

More about Qatargas that matters for portable equipment

Qatargas: projects and investment

In August 2021 Qatargas completed the WHP12N platform jacket for its North Field Production Sustainability project, the first drilling support structure built in Qatar for Qatargas, at the Qcon yard.

Qatargas: who works there

Ras Laffan Liquefied Natural Gas Company was established in 1993 to operate and maintain LNG and helium production, and Qatargas Operating Company was formed in July 2005 to build later projects.

Qatargas: projects and investment

Qatargas 3 and 4 started production in November 2010 and January 2011, and Trains 6 and 7 each added 7.8 million tonnes a year, so the Ras Laffan site has many large mega-trains.

Qatargas: industry on the ground

Helium is produced at Ras Laffan: the first helium came in August 2005, and Ras Laffan Helium 2, inaugurated in 2013, is described as the largest plant of its kind in the world.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In Qatargas. A reviewer at Qatargas, now QatarEnergy LNG, would expect certificate evidence tied to the exact model and marking for LNG trains, offshore facilities and terminal operations. International contractors working at Ras Laffan often bring ATEX or IECEx papers, so a dual route helps compare them. The IS-04Z1 programme is in progress.

The route · specification

Specifying an ATEX and IECEx mobile phone for Qatargas

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Qatargas

Frequently asked questions

Can Qatargas buy the IS-04Z1 today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an ATEX and IECEx mobile phone for Qatargas cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

How does Qatargas approve suppliers?

QatarEnergy LNG is part of the QatarEnergy group, whose Supply Management section describes vendor registration through the Mushtaryat Portal (SAP Vendor Code) and a Preferred Manufacturers List; confirm current requirements with its procurement and HSE teams.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

How do ventures such as Qatargas 1 to 4 differ for site access?

Each venture or operating company at Ras Laffan can maintain its own induction, permit and equipment rules on top of the industrial city's general requirements. Ask the specific venture's HSE team for its procedures, because a device accepted at one train may still need approval at another.

Does the QatarEnergy LNG name change affect supplier registration?

Qatargas now trades as QatarEnergy LNG, and its ventures are run by operating companies under QatarEnergy. Supplier registration and equipment approval remain with the organisation concerned, so confirm the current registration route and contact point through its procurement and HSE teams instead of relying on older Qatargas contacts.

Could the phone be used offshore on North Field facilities?

Only if the final certificate, gas group and temperature class suit the offshore area and the operator permits it. The IS-04Z1 is designed for intrinsically safe handheld use with IP68 protection, but has no certificate yet. Offshore connectivity and charging also need planning, so ask the operator's HSE team.

Enquiry · Qatargas

Ask about the IS-04Z1 for Qatargas, Qatar

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · Qatargas

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Qatargas?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.