The Marsden Point refinery operated from 1964 to 2022 and the site now imports refined fuel, about half from South Korea and about a third from Singapore as of 2025, so tank and terminal work continues there.
The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in New Zealand every shift: Taranaki gas-field operators, methanol and fertiliser plant crews, dairy-processing engineers managing milk-powder dust risk, and the HSE and telecoms teams who equip them. The Alpha well drilled at New Plymouth in 1865 was the first oil well in the Commonwealth; later gas from Kapuni (1970) and Maui (1978) supported large gas-based industrial plants. Distribution partners for New Zealand are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. New Zealand has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | New Zealand: Kapuni, Marsden Point, Dairy processing sites nationwide | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in New Zealand. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS New Zealand market guide.
The Marsden Point refinery operated from 1964 to 2022 and the site now imports refined fuel, about half from South Korea and about a third from Singapore as of 2025, so tank and terminal work continues there.
Gas-based plants developed from the 1970s included an ammonia-urea plant at Kapuni, methanol at Waitara, synthetic petrol at Motunui and gas-fired power stations at New Plymouth and Huntly; confirm each site's current status.
AS/NZS 60079 is the Australia and New Zealand adoption of the IEC 60079 series, covering classification, selection, installation, inspection and repair of electrical equipment in explosive atmospheres.
Ahuroa Gas Storage Facility is the country's only underground gas storage site, so compressor, wellhead and storage-related classified areas are concentrated in a small number of places.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In New Zealand. A New Zealand reviewer in Taranaki or a dairy plant would expect clear certificate evidence that can be checked against the site's hazardous area records. The IS-04Z1 is on an IECEx and ATEX programme, with no certificate issued. A dual route helps international contractors and operators, such as OMV New Zealand, who bring global standards to local work.
A distributor for New Zealand would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
The market guide for New Zealand covers Taranaki, Motunui / Waitara Valley, Kapuni, Marsden Point, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for New Zealand.
Most Ex devices arrive by sea or air freight, and the North Island holds nearly all the gas network, so lead times to Taranaki or Auckland differ from the South Island. Plan spare batteries and accessories in country, and confirm local after-sales support before ordering.
Mainly in Taranaki, where all domestic oil and gas is produced, along the North Island gas pipeline network, at Ahuroa gas storage, and at fuel import terminals such as Marsden Point. Site permits and induction rules differ by operator, so check before arrival.
Dried milk powder is a well-documented combustible dust, and drying towers and storage silos are classified accordingly. The IS-04Z1 is designed for Zone 21 as well as Zone 1, but certification is in progress. Confirm the zone and dust group with the site operator before use.
More on New Zealand, and on other places in New Zealand.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.