Indonesia: background
Pertamina was created in August 1968 by merging Pertamin, founded in 1961, and Permina, founded in 1957 from nationalised Shell assets, and it is headquartered in Jakarta.
A Zone 1 and Zone 21 handset for Indonesian operators, mechanics, inspectors and contractor crews working across an archipelago where the nearest replacement device is often a flight away. This page sets out how a rugged mobile phone supply route to Indonesia will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. A rugged mobile phone for Indonesia cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Indonesia: Bontang, East Kalimantan, Cilegon and Merak, Banten, Cilacap, Central Java | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Indonesia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Indonesia market guide covers.
Pertamina was created in August 1968 by merging Pertamin, founded in 1961, and Permina, founded in 1957 from nationalised Shell assets, and it is headquartered in Jakarta.
Pertamina operates six oil refineries with a combined capacity of around 1 million barrels a day, as of 2013, and has not built a new refinery since Balongan opened in West Java in the mid-1990s.
Radio and telecom equipment certification by SDPPI is compulsory in Indonesia, with a three-year validity, local testing and a local representative required, and a marking requirement.
Technical requirements for 5G devices follow Perdirgen No. 5/2021, so 5G-capable phones are tested against that rule as part of SDPPI certification.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Indonesia. Indonesian sites face heat, humidity, heavy rain and salt air, and remote ones are far from replacement stock. IP68 sealing helps with water and dust ingress. It is an ingress rating, not explosion protection, which must come from certification. Battery behaviour in tropical heat should be tested on a trial unit.
Supply of the IS-04Z1 to Indonesia starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
The market guide for Indonesia covers Cilacap, Central Java, Balikpapan, East Kalimantan, Dumai, Riau, Balongan, West Java, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Tropical sites typically combine heat, high humidity, heavy rain and, near the coast, salt air, so check ingress protection, corrosion resistance and operating temperature range. Confirm site-specific requirements with the operator, including any area classification and approved-device lists.
With thousands of islands, many sites are reached by sea or air, and delays are common. Plan extra lead time and spares for devices, chargers and batteries, and ask the operator or contractor about shipping, customs and site approval rules for each island location.
Supply after certification would be through authorised distributors, and none has been appointed yet. For remote sites, ask about spares, replacement time and training before purchase, and agree the logistics route with the operator. Trial units can be tested to check connectivity and battery use first.
Related guides for Indonesia and for Indonesia.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.