Scale
Texas produced about 41 per cent of US crude in 2019 and had 30 refineries holding 31 per cent of US refining capacity in January 2019.
Texas is the largest US crude oil producer, with onshore fields concentrated in the Permian Basin in the west and the historic East Texas field. Zone 1 work arises at wellsites, tank batteries, compressor stations and gas plants. A rugged mobile phone distributor in Texas oil and gas fields would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Texas oil and gas fields has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Texas oil and gas fields: Compressor stations, Gas processing plants, Wellsites and tank batteries | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Texas Oil Fields. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Texas produced about 41 per cent of US crude in 2019 and had 30 refineries holding 31 per cent of US refining capacity in January 2019.
Drilling shifted west as eastern fields such as East Texas, discovered in 1930, declined. The Permian Basin now dominates onshore output.
As wells in the east of the state depleted, drilling moved westward, and today the busiest activity is in West Texas and under the Gulf of Mexico.
Thirty refineries operating in January 2019 made up 31 percent of national refining capacity, so oilfield and refinery work is closely linked.
The first major Spindletop well was drilled on 10 January 1901, and the East Texas Oil Field, found in 1930, is the largest and most prolific oil reservoir in the contiguous United States.
The Commission keeps about 132 million pages of well history documents, from drilling permits onward, and publishes monthly production data by county.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Texas oil and gas fields. Texas oil fields range from the hot, arid west to the older fields in the east, and drilling activity has shifted west. Dust, heat and rain all arise. IP68 sealing helps with ingress, but it is not explosion protection; that depends on the Ex marking still in certification.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Texas oil and gas fields. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are wellsites and tank batteries, drilling rigs, compressor stations, gas processing plants. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Texas oil and gas fields.
The Railroad Commission of Texas regulates oil and gas production, pipelines and LPG safety, while each operator sets its own electrical safety and equipment rules. For equipment approvals, ask the operator which marks and standards they accept.
US sites commonly use the National Electrical Code, which includes both a Class and Division approach and a Zone approach, and equipment is typically tested by a recognised US laboratory. The operator's area classification is the deciding document.
Classification is site-specific, whatever the field's age. A wellsite, tank battery, compressor station or gas plant each has its own classification and drawings. Compare the IS-04Z1 target marking against each, and ask the operator about permit rules. Certification is still in progress.
More on Texas Oil Fields, and on other places in United States.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.