History
Oil was discovered in the Williston Basin in 1951. Horizontal drilling and hydraulic fracturing lifted output, and North Dakota and Montana together passed 1 million barrels a day in April 2014.
The Bakken is a shale oil formation in the Williston Basin of western North Dakota, centred on towns such as Williston and Watford City. Zone 1 work arises at drilling rigs, wellsites, tank batteries and gas gathering facilities. Distribution partners for Bakken, North Dakota (Williston Basin) are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Bakken, North Dakota (Williston Basin) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Bakken, North Dakota (Williston Basin): Gas gathering and processing, Crude loading facilities, Drilling rigs | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in North Dakota Bakken. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Oil was discovered in the Williston Basin in 1951. Horizontal drilling and hydraulic fracturing lifted output, and North Dakota and Montana together passed 1 million barrels a day in April 2014.
Operators listed for the Bakken include Continental Resources, Chord Energy, EOG Resources and Hess. Chevron completed its purchase of Hess on 18 July 2025.
The city sits at the crossroads of US Highways 2 and 85, near the Missouri and Yellowstone rivers, about 18 miles from Montana and 60 miles from the Canadian border.
Satellite land-cover data show about 46 square kilometres of developed land around Williston in 2024, showing how energy development left a lasting footprint on a rural town.
Williston sits close to the centre of the Williston Basin, directly above the Bakken Formation, which is among the largest oil fields in the United States.
The Bakken is relatively thin, no more than 250 feet, with low permeability, so better knowledge of where the resource lies has translated directly into higher output.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Bakken, North Dakota (Williston Basin). The Bakken is remote with cold winters, so low-temperature performance and battery life are practical concerns for portable equipment. IP68 sealing helps against snow melt, dust and wet hands, but it does not give explosion protection. The IS-04Z1 specifies a 4,000 mAh battery; cold-weather runtime should be evaluated.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Bakken, North Dakota (Williston Basin). Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are drilling rigs, wellsites and tank batteries, gas gathering and processing, crude loading facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Bakken, North Dakota (Williston Basin).
Williston Basin International Airport opened in 2019 and is the closest airport, usually reached through a larger US hub. Allow for road transfers and winter weather delays, and agree site access in advance.
Many wellpads and processing plants are spread over rural plains, with Williston acting as the main service base. Confirm network coverage, emergency contact procedures and lone-worker policies with the operator, because coverage and response times differ from city sites.
The North Dakota Department of Mineral Resources, Oil and Gas Division oversees oil and gas activity. It does not approve phones. Equipment requirements generally come from operators and field service contractors, and SAMS holds no certificate yet, so ask the relevant operator what it would accept.
More on North Dakota Bakken, and on other places in United States.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.