Canada: rules and approvals
Canada also accepts field certification for custom-made or low-volume equipment, evaluated at the installation site, which is similar to unit verification under the IECEx and ATEX systems.
The IS-04Z1 is an Ex phone for people working inside classified areas at Canadian oil sands plants, gas plants, refineries and offshore platforms. Zone approval in Canada uses the CAN/CSA C22.2 No. 60079 series, and an existing IECEx certificate with test reports can shorten the work, because mainly the national differences then have to be addressed. Distribution partners for Canada are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Canada has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Location class | Class I, Division 1 (gas and vapour) | Part of the certification programme |
| Listing | Listing by a nationally recognised testing laboratory | In progress; not issued |
| Group | Gas groups A to D | Group listing to be confirmed |
| Where it applies | Canada: Alberta Industrial Heartland, Montney and Duvernay, Sarnia Chemical Valley | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Canada. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Canada market guide.
Canada also accepts field certification for custom-made or low-volume equipment, evaluated at the installation site, which is similar to unit verification under the IECEx and ATEX systems.
Hazardous locations in Canada fall under Section 18 of the Canadian Electrical Code Part I, which uses the Zone system, while the older Class and Division rules are kept in Annex J for existing installations.
The Athabasca oil sands in Alberta hold bitumen so viscous that it will not flow unless heated or diluted with lighter hydrocarbons such as condensate, so diluent and heating systems feature heavily at sites.
Electrical products for hazardous locations must be certified by a body accredited by the Standards Council of Canada, and IECEx or ATEX certificates are not accepted in place of that certification.
North America classifies hazardous locations by Class and Division under the National Electrical Code (NEC 500, with NEC 505 as the zone-based alternative); Canada uses the Canadian Electrical Code. Class I Division 1 is the closest counterpart to Zone 1 for flammable gases and vapours. Equipment must be listed by a nationally recognised testing laboratory.
NEC 500 Class I Division 1 is one of the four routes in the IS-04Z1 certification programme. It is in progress and no listing has been issued.
In Canada. In Canada one operator calls an area Zone 1 IIC while the plant down the road calls it Class I Division 1 Group B, because Section 18 of CSA C22.1 classifies by Zone and Annex J18 keeps the older Division system. The IS-04Z1 has Class I Division 1 as a target on the same intrinsic safety basis, still in progress.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Canada yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
NEC 500 Class I Division 1 is part of the certification programme and is in progress. No listing has been issued.
The market guide for Canada covers Athabasca oil sands, Cold Lake and the Lakeland, Alberta Industrial Heartland, Montney and Duvernay, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Canada.
Hazardous-location electrical equipment in Canada is generally expected to carry certification from a Standards Council of Canada accredited body, and IECEx or ATEX certificates are not accepted as a substitute, although they can speed the evaluation. Confirm the required marking with the site operator and a Canadian certification body.
Fort McMurray averages about minus 17 degrees Celsius in January and has seen extremes below minus 50, so check the datasheet's operating and charging temperature range, battery behaviour in cold, and glove-friendly controls. Confirm any site cold-weather procedures with the operator before deployment.
Every battery gives up capacity in the cold, and the 4,000 mAh cell is sized for a normal shift, not extreme cold. Unless a certificate says otherwise, hazardous area equipment is assessed for minus 20 to plus 40 degrees Celsius, and the marked range will be published when the certificate issues. Check it first.
Other guides for Canada, other places in Canada, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.