PTT: projects and investment
In 2012 PTT Exploration and Production took over Cove Energy, which held an 8.5% share in a large offshore natural gas field in Mozambique, extending PTT's offshore gas work abroad.
PTT is Thailand's state-controlled national energy company, with the Ministry of Finance holding 51.1%. Affiliated companies include PTT Exploration and Production, PTT Global Chemical and PTT Green Energy, so upstream, petrochemical and power sites each have their own operating teams and procurement. Buyers searching for an intrinsically safe smartphone supplier for PTT can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe smartphone for PTT cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | PTT: LPG terminals, Group refineries and petrochemical units, Gas separation plants | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Thailand. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
In 2012 PTT Exploration and Production took over Cove Energy, which held an 8.5% share in a large offshore natural gas field in Mozambique, extending PTT's offshore gas work abroad.
PTT was established on 29 December 1978 as the Petroleum Authority of Thailand, and was corporatised and re-registered as PTT Public Company Limited on 1 October 2001, listing on the Stock Exchange of Thailand that December.
The headquarters is on Vibhavadi Rangsit Road in Chatuchak, Bangkok, while its key assets are offshore in the Gulf of Thailand and at industrial sites, so site contacts are separate from head office.
PTT opened the Bangchak oil refinery in Bangkok in 1985 and built a nationwide network of fuel distribution outlets, adding refinery and retail forecourt areas to its estate.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In PTT. Rounds at gas separation plants, receiving facilities and LPG terminals involve gauges, valves and checklists across large sites. A handheld designed for intrinsic safety could capture readings, photos and calls in classified spots if its certificate allows. Permit rules at Map Ta Phut in Rayong belong to PTT and its group companies.
There is no stock to order for PTT yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Thai is the working language for site staff, while English is commonly used in engineering and international projects. Manuals and training for hazardous-area devices are therefore often expected in Thai and English. Confirm the required languages with the relevant PTT group company.
Gulf of Thailand and Rayong-area sites are hot and humid with heavy monsoon rain and salty air, which stresses seals, connectors and batteries. Look for high ingress protection, corrosion resistance and a suitable temperature rating, and ask the site about its own environmental limits.
The IS-04Z1 is IP68 rated against dust and water, which helps with rain and humidity. Temperature and humidity limits will be set by the final certificate and datasheet, so check them. IP68 is not explosion protection. Certification is in progress and nothing has been issued.
More on PTT, and on other places in Thailand.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.