Portugal: who works there
Galp Energia, formed in 1999 from Petrogal, Gás de Portugal and Transgás, is Portugal's largest oil and gas group, with business units covering upstream, refining and midstream, commercial, and renewables.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the refining and polymer complex at Sines, the chemical plants at Estarreja and the pulp, cement and mining sites in between. This page sets out how an intrinsically safe mobile phone supply route to Portugal will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe mobile phone for Portugal cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Portugal: Setúbal and the Sado, Figueira da Foz, Sines | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Portugal. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Portugal market guide.
Galp Energia, formed in 1999 from Petrogal, Gás de Portugal and Transgás, is Portugal's largest oil and gas group, with business units covering upstream, refining and midstream, commercial, and renewables.
The Sines hard coal power plant operated from 1985-1989 until January 2021 and coal-fired generation ended in 2021, so former coal sites are being redeveloped.
Oil made up 44% of Portugal's total energy supply in 2023, so fuel storage, port terminals and distribution depots form a large part of the classified-area infrastructure.
In 2021 Portugal imported 2.8 billion cubic metres of LNG from Nigeria, almost 50% of its gas imports that year, so ship-to-shore LNG operations are central to gas supply.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Portugal. Large sites and small crews mean a single operator may cover long rounds across Sines, Estarreja or a pulp mill at Figueira da Foz. An intrinsically safe handheld lets one person log findings, photograph equipment and run a work-order app without returning to a control room for each entry.
Supply of the IS-04Z1 to Portugal starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for Portugal covers Sines, ZILS Alentejo, Estarreja, Matosinhos and Leça, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Atlantic coastal sites are salt-laden and summers can be hot, so check the maximum ambient temperature on the certificate, the water and dust ingress rating and the condition of charging contacts. Sealed connectors and regular cleaning are typically recommended for coastal terminals.
Portugal has a hydrogen strategy aimed at reducing gas imports by 2030, so hydrogen projects may create new classified areas. Hydrogen belongs to a more demanding gas group than propane, so check the gas group marking of a device against the project's area classification.
Sites such as Sines or the Alentejo interior can be far from anyone who services equipment, so a reachable service route matters. SAMS has appointed no distributor yet. Before purchase, ask what repair, replacement and battery support would be available for your plant, and agree it in writing.
More on Portugal, and on other places in Portugal.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.