Pakistan: industry on the ground
Oil production was confined to Punjab until 1981, when a company found the first field in Lower Sindh; by 1998-99 the Lower Sindh gas fields produced more oil than Punjab.
A Zone 1 / Zone 21 smartphone for crews on the gas fields of Sindh and Balochistan, the refineries at Karachi, Attock and Mahmood Kot, the LNG terminals at Port Qasim and the fertiliser plants. Buyers searching for an intrinsically safe cell phone supplier for Pakistan can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe cell phone for Pakistan cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Pakistan: Hub, Balochistan, Mahmood Kot, Muzaffargarh, Sui, Balochistan | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Pakistan market guide covers.
Oil production was confined to Punjab until 1981, when a company found the first field in Lower Sindh; by 1998-99 the Lower Sindh gas fields produced more oil than Punjab.
Domestic refining typically meets about 60% of Pakistan's diesel, 30% of motor gasoline and all jet fuel demand, so the rest arrives as imports through port terminals.
The Pakistan Telecommunication Authority, headquartered in Islamabad, regulates telecom systems and radio spectrum under the 1996 Telecommunication (Re-organization) Act, with zonal offices in Karachi, Lahore, Gwadar, Quetta, Peshawar and other cities.
Pakistan's first gas field was found near Sui in Balochistan in 1952, and the Sui area remains a name associated with the country's gas supply and upstream classified-area work.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Pakistan. Rounds at a wellsite, a compressor station, a Port Qasim LNG terminal or a fertiliser plant make many entries into classified ground. An intrinsically safe handheld lets an operator photograph, log and scan equipment on foot. Because there is no safe-area socket mid shift, the battery must carry a working day.
There is no stock to order for Pakistan yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for Pakistan covers Sui, Balochistan, Daharki and Ghotki, Sindh, Port Qasim, Karachi, Korangi, Karachi, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Allow for import clearance, courier or freight time and any PTA rules for radio-equipped devices, then keep spare batteries and chargers on site. Large refineries typically run contractor induction before work, so agree device approval at the start of planning.
The Pakistan Telecommunication Authority, set up in 1996, regulates telecom systems and spectrum, with zonal offices in cities including Karachi, Lahore and Quetta. Device import and approval rules change over time, so check current PTA requirements with your importer before shipping.
Summer ambients there can pass 45 degrees. The certified ambient range is stated on the certificate and will be published when issued, so check it against your site maximum before planning summer use. IP68 and a rugged build help with dust but do not extend the certified range.
Related guides for Pakistan and for Pakistan.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.