Pakistan: logistics and access
Port Qasim near Karachi handles about 35% of Pakistan's cargo, roughly 17 million tonnes a year, and with Karachi port carries almost 90% of external trade, so most imported equipment clears through these two ports.
A Zone 1 / Zone 21 smartphone for crews on the gas fields of Sindh and Balochistan, the refineries at Karachi, Attock and Mahmood Kot, the LNG terminals at Port Qasim and the fertiliser plants. Buyers searching for an industrial mobile phone supplier for Pakistan can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An industrial mobile phone for Pakistan cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Pakistan: Hub, Balochistan, Mahmood Kot, Muzaffargarh, Sui, Balochistan | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Pakistan market guide.
Port Qasim near Karachi handles about 35% of Pakistan's cargo, roughly 17 million tonnes a year, and with Karachi port carries almost 90% of external trade, so most imported equipment clears through these two ports.
Five main refineries have a combined capacity of about 450,000 barrels a day, producing diesel, motor gasoline, furnace oil, jet fuel, kerosene, LPG and naphtha, so product storage and loading areas are widespread.
The Thar coalfield in Sindh covers over 9,000 square kilometres and holds an estimated 200 billion tonnes of lignite; the Sindh Engro Coal Mining Company is the principal mining operator there.
The Toot oil field in Punjab, about 135 km south-west of Islamabad, saw its first well in 1964 and commercial production from 1967, showing that upstream work also happens in the inland north.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Pakistan. Fleets spread from field to city, with handsets travelling long distances and shared between crews. Android 16 with EMM and MDM gives control over a shared fleet, though coverage on remote fields can be thin, so the device falls back to plant Wi-Fi. Charge in a safe area, and plan the battery for a shift.
Nothing can be bought for Pakistan today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Pakistan covers Sui, Balochistan, Daharki and Ghotki, Sindh, Port Qasim, Karachi, Korangi, Karachi, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Examples include the Sui gas area in Balochistan, the Toot field in Punjab, Lower Sindh gas fields and the five main refineries. Which areas are classified, and to what zone, is decided by each operator, so ask for its hazardous-area drawings.
Operators commonly ask for recognised international certification such as IECEx or ATEX against IEC 60079, but acceptance is set site by site. Request the operator's equipment approval procedure and provide certificates, marking details and manufacturer instructions with your submission.
Coverage depends on the carrier, not the handset. The device is designed to fall back to plant Wi-Fi where the signal is thin, but that depends on the site's network. Confirm with the field operator what connectivity is available before relying on it for work orders.
Related guides for Pakistan and for Pakistan.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.