The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for refinery rounds in the Attica heat, gas terminal work at Revithoussa and Alexandroupolis, and the cargo and bunker operations that run out of Piraeus. This page sets out how an intrinsically safe cell phone supply route to Greece will work for the IS-04Z1, and what is and is not available before launch.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Greece, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicintrinsically safe
DeviceCell Phone
RouteSupply
WhereGreece

Short answer. An intrinsically safe cell phone for Greece cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · intrinsically safe

Checklist: intrinsically safe cell phone for Greece

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
Level of protectionia, ib or ic matched to the zoneib, for Zone 1
Entity parametersUo, Io and Po within the device limitsPublished with the certificate
AccessoriesChargers and cases certified with the deviceDefined at certification
Where it appliesGreece: Revithoussa, Alexandroupolis, AspropyrgosClassified by the site operator
Product · Greece

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Greece. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Greece

Where an Ex phone is used in Greece

Operators and classified areas drawn from the SAMS Greece market guide.

Operators, EPCs and contractors

HELLENiQ ENERGY
Refineries at Aspropyrgos, Elefsina and Thessaloniki with associated petrochemicals.
Motor Oil Hellas
Refining and downstream production at Agioi Theodoroi on the Corinthian Gulf.
DESFA
National gas transmission system operator and the Revithoussa LNG terminal.
Gastrade
Operates the Alexandroupolis floating storage and regasification unit.
DEPA Commercial
Gas supply and trading across the Greek network.
Trans Adriatic Pipeline
Gas transmission across northern Greece with compressor stations in Thrace.

Industrial areas and sites

Aspropyrgos
The largest refining complex in the country, in the Thriasio plain.
Elefsina
Refinery, tank farm and the ship repair yards in the same bay.
Agioi Theodoroi
Refining, jetty loading and downstream units on the Corinthian Gulf.
Thessaloniki
Northern refinery, petrochemical units and the port fuel terminals.
Revithoussa
Island LNG import terminal and regasification plant near Megara.
Alexandroupolis
Floating regasification unit and the gas link into the Balkan network.
Field notes · Greece

More about Greece that matters for portable equipment

Greece: who works there

HelleniQ Energy, formerly Hellenic Petroleum, operates three refineries at Thessaloniki, Elefsina and Aspropyrgos with 57% of national refining capacity; Motor Oil Hellas holds the remaining 43%.

Greece: logistics and access

Greece imported about 496,600 barrels of oil a day against domestic production of 7,946, according to the cited 2011 data, so imported crude moves through port terminals and tank farms.

Greece: who works there

Motor Oil Hellas, headquartered in Marousi, operates the Corinth refinery, which gives it about 35% of Greek refining, and its naphtha complex of 22,000 barrels a day was completed in 2022.

Greece: industry on the ground

Petrochemicals, including plastics, PVC, polypropylene, aliphatic solvents, chlorine and sodium hydroxide, are produced at a unit forming part of the Thessaloniki refinery.

The term · intrinsically safe

What “intrinsically safe” means for a smartphone

Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.

The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.

In Greece. Rounds at Aspropyrgos, Elefsina and Agioi Theodoroi in the Attica heat, and bunker and cargo work at Piraeus, mean crews carry a handset between zones. An intrinsically safe device lets them photograph, record and report at the point of work. That is the design intent, pending certification and operator approval.

The route · supply

Sourcing the IS-04Z1 for Greece

There is no stock to order for Greece yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · Greece

Frequently asked questions

Can we buy an intrinsically safe cell phone in Greece today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an intrinsically safe cell phone in Greece cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

What does ‘intrinsically safe’ mean for the IS-04Z1?

The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.

Which sites in Greece does this cover?

The market guide for Greece covers Aspropyrgos, Elefsina, Agioi Theodoroi, Thessaloniki, among others. Site-level pages are linked below.

How will SAMS supply Greece?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

Do Greek sites accept ATEX certified devices?

Greece is an EU member, so ATEX Directive 2014/34/EU applies and CE plus Ex marking is the normal basis for acceptance, with zoning under Directive 1999/92/EC. Refineries typically add their own permit-to-work and device registration. Ask the safety office for its current process.

Where are Greece's main refineries?

HelleniQ Energy runs refineries at Thessaloniki, Elefsina and Aspropyrgos, and Motor Oil Hellas operates the remaining capacity. These are the best-known large classified-area sites. Operators run their own contractor induction and device approval, so confirm requirements before arrival.

Will a handset cope with Greek summer heat and salt air?

The IS-04Z1 is designed with IP68 sealing for industrial use, but heat affects any battery. Ask for the datasheet's temperature range and test a unit on a real summer round near the coast. Site rules on charging and storing devices still apply.

Enquiry · Greece

Ask about the IS-04Z1 for Greece

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Greece

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Greece?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.