Operator change
The block passed from Chevron's Indonesian subsidiary to PT Pertamina Hulu Rokan in 2021, after about 70 years, so procurement follows Pertamina group processes.
Pekanbaru is the capital of Riau province on Sumatra and the regional base for the Rokan block, a 6,220 square kilometre oil area including the Minas, Duri and Bekasap fields. Pertamina Hulu Rokan now runs the Rokan block, which also includes the giant Minas field, where production began in April 1952, so one operator oversees several large mature fields around Pekanbaru. Distribution partners for Pekanbaru and the Rokan block, Riau are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Pekanbaru and the Rokan block, Riau has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Pekanbaru and the Rokan block, Riau: Oil treatment and storage, Steam generation and power facilities, Gathering stations | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pekanbaru Oil Field. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The block passed from Chevron's Indonesian subsidiary to PT Pertamina Hulu Rokan in 2021, after about 70 years, so procurement follows Pertamina group processes.
Pekanbaru has a tropical rainforest climate with rain in every month.
Indonesian is the official language in Pekanbaru, while Minangkabau is widely used in markets and daily business, and Riau Malay and Javanese are also commonly spoken, so site teams are often multilingual.
A pipeline from Duri to the Dumai export terminal was completed by 1958, and the first road linking Pekanbaru with Dumai was built by the operator, forming the logistics spine of the Riau oil region.
Chevron Pacific Indonesia handed over the Rokan block to Pertamina Hulu Rokan on 8 August 2021 after 97 years in Indonesia and more than 12 billion barrels of oil produced from central Sumatra.
The Duri area developed as a residential hub for the workforce that supports production, with roads, electricity networks and storage tanks built alongside the field.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Pekanbaru and the Rokan block, Riau. Procurement follows Pertamina group processes since the block passed from Chevron's Indonesian subsidiary. A fleet would need MDM or EMM enrolment, contractor and operator ownership rules and safe-area charging. Coverage across a large block should be tested before rollout.
A distributor for Pekanbaru and the Rokan block, Riau would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are gathering stations, wellheads and flowlines, oil treatment and storage, steam generation and power facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Pekanbaru and the Rokan block, Riau.
Typical areas include wellheads, flowlines, gathering stations, tank farms, pump stations and loading facilities, where flammable vapour can be released. The operator sets the zones, so confirm the classification for each facility rather than assuming one rule for the whole field.
The first road linking Pekanbaru with Dumai was built for the oilfield, and roads and a pipeline connect the Duri area to the Dumai port. Plan for customs clearance in Indonesia and site gate checks on electronics, and confirm lead times and import rules with your freight agent.
No, Pekanbaru is the regional support city for the block. Hazardous areas are in the field facilities, such as gathering stations and treatment plants. Office and workshop areas usually follow normal rules. Ask the operator which areas are classified.
More on Pekanbaru Oil Field, and on other places in Indonesia.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.