Kazakhstan: rules and approvals
Kazakhstan applies TR CU 012/2011, the Eurasian Economic Union technical regulation, to equipment for explosive atmospheres; certification is mandatory and self-declaration is not allowed.
A Zone 1 / Zone 21 smartphone for crews at Tengiz, Kashagan and Karachaganak, the Atyrau, Pavlodar and Shymkent refineries and the coal and metals industry of Karaganda and Ekibastuz. This page sets out how an industrial mobile phone supply route to Kazakhstan will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An industrial mobile phone for Kazakhstan cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Kazakhstan: Pavlodar and Shymkent, Karaganda coal basin, Tengiz, Atyrau region | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kazakhstan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Kazakhstan market guide.
Kazakhstan applies TR CU 012/2011, the Eurasian Economic Union technical regulation, to equipment for explosive atmospheres; certification is mandatory and self-declaration is not allowed.
Atyrau, 350 kilometres north of Tengiz, is the main transport hub for Tengiz oil, so road, rail and air links through Atyrau shape logistics for the western fields.
Under TR CU 012/2011 the applicant must be registered in a member state, testing is done by bodies in the union's unified register, and ATEX or IECEx certificates are not accepted in place of it.
Telecommunications matters, including radio-frequency conversion procedures, are handled by the Telecommunications Committee within the ministry responsible for digital development.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Kazakhstan. Kazakh operations involve national companies, international consortia and many contractors, so EMM or MDM enrolment helps provision devices per contract. The IS-04Z1 is designed for managed deployment. Sites hundreds of kilometres from a city need a connectivity and charging plan agreed with the site team.
Supply of the IS-04Z1 to Kazakhstan starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Kazakhstan covers Tengiz, Atyrau region, Atyrau, Kashagan and Bolashak, North Caspian, Karachaganak, West Kazakhstan, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Equipment for explosive atmospheres falls under the Eurasian Economic Union regulation TR CU 012/2011, where certification is mandatory, self-declaration is not accepted and ATEX or IECEx certificates do not replace it. The applicant must be registered in a member state. Confirm requirements with an accredited EAEU certification body.
Telecommunications matters, including radio-frequency procedures, are handled by the Telecommunications Committee under the ministry responsible for digital development. Whether a specific phone needs notification or registration depends on its radio technologies, so check current requirements with the committee or a local representative before importing.
The market guide says EAC Ex certification under TR CU 012/2011 is required and planned after IECEx. It has not been granted. Ask the operator which approvals it needs, and check the current certification status before placing any order.
More on Kazakhstan, and on other places in Kazakhstan.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.