Denmark: rules and approvals
Manufacturers who apply the ATEX provisions and affix CE and Ex markings may sell equipment anywhere in the EU without further requirements for those risks, so Danish buyers can use EU-wide certificates.
The IS-04Z1 is an explosion proof mobile phone designed for Zone 1 and Zone 21, from a wet deck 225 km west of Esbjerg to a fermentation building at Kalundborg and a biogas upgrading skid on Lolland. This page sets out how an industrial cell phone supply route to Denmark will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An industrial cell phone for Denmark cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Denmark: Stigsnæs, Prøvestenen and Copenhagen harbour, Esbjerg | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Denmark. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Denmark market guide.
Manufacturers who apply the ATEX provisions and affix CE and Ex markings may sell equipment anywhere in the EU without further requirements for those risks, so Danish buyers can use EU-wide certificates.
Denmark expects to remain self-sufficient in oil until 2050 according to the cited article, so existing offshore and onshore oil facilities are likely to need maintenance work for years to come.
Coal supplied less than 11% of electricity in 2019 and coal-fired generation was scheduled to end by 2028, so biomass and gas plants are replacing coal sites.
A target of 100% renewable electricity by 2030 and a wind turbine industry dating from the 1970s mean wind and green-energy projects are a large share of current construction work.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Denmark. A handset can be wiped, re-enrolled and given to the incoming rotation without a technician touching it, so the device follows the bunk rather than the individual and no time is lost at the heliport. Android 16 with EMM and MDM supports that, with a Danish interface. Charging stays in safe areas.
There is no stock to order for Denmark yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Denmark covers Esbjerg, The Danish North Sea, Fredericia, Kalundborg, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Denmark applies ATEX Directive 2014/34/EU as an EU member, and the directive explicitly covers equipment used on fixed offshore platforms. Operators typically add their own approval, helicopter and survival-suit procedures. Confirm the platform operator's device rules well ahead of a trip.
Yes, though the sector is mature. Oil and gas production began scaling in the 1980s and continues, with maintenance and decommissioning work. Other hazardous-area work comes from biogas, power and industrial plants. Confirm current projects with operators rather than relying on past production figures.
It is designed for Zone 1 gas and Zone 21 dust, with four-constellation GNSS and 4G LTE for lone working, but certification is in progress and no certificate exists. Suitability depends on the area classification and gas group at each plant. Check with the plant operator and request the datasheet.
More on Denmark, and on other places in Denmark.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.