Greece: industry on the ground
Petrochemicals, including plastics, PVC, polypropylene, aliphatic solvents, chlorine and sodium hydroxide, are produced at a unit forming part of the Thessaloniki refinery.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for refinery rounds in the Attica heat, gas terminal work at Revithoussa and Alexandroupolis, and the cargo and bunker operations that run out of Piraeus. The 213 km Thessaloniki-Skopje pipeline resumed operations at the beginning of 2026 after a 13-year suspension, so product pipeline terminals are active again at both ends. Distribution partners for Greece are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Greece has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Greece: Agioi Theodoroi, Thessaloniki, Revithoussa | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Greece. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Greece market guide.
Petrochemicals, including plastics, PVC, polypropylene, aliphatic solvents, chlorine and sodium hydroxide, are produced at a unit forming part of the Thessaloniki refinery.
Renewables and hydropower rose from over 20% to around 50% of electricity generation since 2015, while lignite fell from 60% in 2005 to about 10% in 2021.
A 390 MW natural gas power station in Thessaloniki opened in 2005 and is run by a subsidiary, adding gas-fired power to the refinery complex.
HelleniQ Energy operated 1,475 service stations in Greece in 2026, so fuel forecourts with classified areas are spread across the mainland and islands.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Greece. Greek sites combine operator staff, yard workers and visiting contractors, sometimes on vessels with no other reason to call in Greece. The IS-04Z1 is designed for EMM or MDM enrolment. Charging should be in safe areas, and connectivity at quays and terminals should be checked with the site IT team.
A distributor for Greece would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Greece covers Aspropyrgos, Elefsina, Agioi Theodoroi, Thessaloniki, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Greece.
Greece is an EU member, so ATEX Directive 2014/34/EU applies and CE plus Ex marking is the normal basis for acceptance, with zoning under Directive 1999/92/EC. Refineries typically add their own permit-to-work and device registration. Ask the safety office for its current process.
HelleniQ Energy runs refineries at Thessaloniki, Elefsina and Aspropyrgos, and Motor Oil Hellas operates the remaining capacity. These are the best-known large classified-area sites. Operators run their own contractor induction and device approval, so confirm requirements before arrival.
The IS-04Z1 is designed with IP68 sealing for industrial use, but heat affects any battery. Ask for the datasheet's temperature range and test a unit on a real summer round near the coast. Site rules on charging and storing devices still apply.
Other guides for Greece, other places in Greece, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.