Turkey: infrastructure
Electricity supplies about 20% of Turkey's energy and comes mainly from coal, gas and hydro, with a small but growing share from wind, solar and geothermal.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for refinery and petrochemical work at Aliağa and on the Marmara, gas terminal and pipeline operations, and the fertiliser and chemical plants inside the organised industrial zones. This page sets out how an IECEx smartphone supply route to Turkey will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for Turkey cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Turkey: Dörtyol, Kırıkkale, Aliağa | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Turkey. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Turkey market guide.
Electricity supplies about 20% of Turkey's energy and comes mainly from coal, gas and hydro, with a small but growing share from wind, solar and geothermal.
The Ceyhan marine terminal on the Mediterranean has seven storage tanks and a jetty that can load two tankers of up to 300,000 DWT at once, as the end point of the Baku-Tbilisi-Ceyhan pipeline.
Black Sea gas is forecast to meet all residential demand from the late 2020s, which implies new offshore and onshore gas processing and pipeline work.
Energy policy aims to secure national supply and reduce fossil fuel imports, which accounted for over 20% of the cost of Turkey's imports in 2019, so domestic gas and refining projects are a priority.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Turkey. IECEx matters in Türkiye through international groups and contractors at the Aliağa and Marmara complexes, and at the Ceyhan export terminal. A certificate of conformity and its schedule of conditions lets their safety teams compare the handset with a common reference. For the IS-04Z1, this certification is still in progress.
Supply of the IS-04Z1 to Turkey starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Turkey covers Aliağa, Körfez and Kocaeli, Marmara Ereğlisi, Ceyhan, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Conditions range from hot coastal summers to cold central and eastern winters, so check both the maximum and the lowest ambient ratings on the certificate, the water and dust ingress rating and touch operation with gloves. Coastal terminals also add salt air.
Turkish is the working language, and instructions are typically expected in the language of the destination country, with English accepted at some international operators. Provide the certificate, declaration of conformity and Ex marking details, and ask the operator what it requires.
The sheet states Turkish on the screen and in the file, on Android 16. Confirm the language pack, keyboard and the language of the certificate and manual with the supplier during an evaluation, particularly for contractor crews.
More on Turkey, and on other places in Turkey.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.