Italy: geography and layout
The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, so upstream work extends to the south of the country as well as offshore.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refineries, petrochemical poles and gas terminals from Porto Marghera to Priolo and Sarroch. Buyers searching for an IECEx smartphone supplier for Italy can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for Italy cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Italy: Taranto, Brindisi, Priolo, Melilli and Augusta | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Italy. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Italy market guide covers.
The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, so upstream work extends to the south of the country as well as offshore.
Moderate natural gas reserves have been found mainly in the Po Valley and offshore in the Adriatic Sea, which concentrates gas production and processing in the north and east.
Hydropower was practically the only source of electricity until 1960, and all of Italy's active geothermal plants are in Tuscany, so dam and geothermal sites sit alongside oil and gas facilities.
Eni, which operates in 79 countries, is counted among the world's seven oil and gas supermajors, so Italian refineries and gas sites often follow large-operator procedures for contractors and equipment.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Italy. Italian refineries and terminals such as Priolo, Sarroch and Porto Marghera involve operators, offshore engineering firms and international contractors. For them IECEx is a familiar reference, with a certificate of conformity naming the equipment and a schedule of conditions. IECEx certification for the IS-04Z1 is in progress; none can be cited yet.
Supply of the IS-04Z1 to Italy starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Italy covers Priolo, Melilli and Augusta, Gela, Milazzo, Sarroch, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Italy applies ATEX Directive 2014/34/EU as an EU member, and employers zone workplaces under Directive 1999/92/EC. Devices for Zone 1 and Zone 2 should carry CE and Ex markings with Italian-language instructions where required. Operators usually add their own approval and permit procedures.
The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, and the Po Valley and offshore Adriatic hold moderate gas reserves. Refineries, fuel terminals and gas stations add downstream sites. Confirm site lists with the operator.
The market guide says teams can test a unit through a fermata while certification runs. Trial terms and site access are set by the plant operator, and a unit would need to be accepted for the zones it enters. Ask the operator's HSE team before arranging a trial.
Other guides for Italy, other places in Italy, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.