Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Italy · explosion proof

Explosion-Proof Mobile Phone Distributor in Italy

The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refineries, petrochemical poles and gas terminals from Porto Marghera to Priolo and Sarroch. The Sarroch refinery in Sardinia, run by Saras since it began operating in 1965, has a refining capacity of about 15 million tonnes a year, equal to roughly 15% of total Italian refining capacity. Distribution partners for Italy are being identified ahead of the Q4 2026 launch of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Italy, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicexplosion proof
DeviceMobile Phone
RouteDistribution
WhereItaly

Short answer. Italy has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.

Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · explosion proof

Checklist: explosion proof mobile phone for Italy

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
Protection conceptFlameproof (Ex d) or intrinsic safety (Ex i)Intrinsic safety, level ib
Zone suitabilityZone 1 gas and Zone 21 dustDesign target for Zone 1 and 21
CertificateNumber, issuing body and schedule of conditionsIn progress; not issued
Where it appliesItaly: Milazzo, Sarroch, TarantoClassified by the site operator
Product · Italy

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Italy. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Italy

Where an Ex phone is used in Italy

Operators and classified areas drawn from the SAMS Italy market guide.

Operators, EPCs and contractors

Eni
Refining and biorefining at Sannazzaro, Taranto, Gela and Venice.
Versalis
The Eni petrochemical arm, with plants at Brindisi, Priolo and Ravenna.
Sarlux
Runs the Sarroch refinery and its power complex in Sardinia.
ISAB
Priolo Gargallo refinery, around 320,000 barrels a day.
Raffineria di Milazzo
Refinery and marine terminal on the north Sicilian coast.
Snam
National gas transmission, underground storage and regasification.

Industrial areas and sites

Priolo, Melilli and Augusta
The largest Sicilian petrochemical belt, refining and chemicals together.
Gela
South Sicilian coastal site, now producing biofuels.
Milazzo
Refinery and port on the Tyrrhenian side of Sicily.
Sarroch
Sardinian refinery of about 300,000 barrels a day.
Taranto
Refinery and heavy industry on the Ionian coast.
Brindisi
Petrochemical plant, power generation and port on the Adriatic.
Field notes · Italy

More about Italy that matters for portable equipment

Italy: rules and approvals

Directive 2014/34/EU became mandatory for manufacturers on 20 April 2016, replacing Directive 94/9/EC, and equipment groups divide into Group I for mining and Group II for surface industries.

Italy: infrastructure

Natural gas supplies more than half of Italian electricity, and an important share of electricity is imported, mainly from Switzerland and France, so gas-fired power stations are a large source of classified areas.

Italy: logistics and access

Petroleum is mostly used for transport and natural gas for electricity and heating, so fuel terminals, depots and gas distribution networks are found across the whole country.

Italy: geography and layout

The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, so upstream work extends to the south of the country as well as offshore.

The term · explosion proof

What “explosion proof” means for a smartphone

“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.

The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.

In Italy. In Italy explosion-proof can mean several things. A refinery, a regasification terminal and a petrochemical pole use different concepts. Flameproof Ex d suits some fixed equipment, while a handset used on a fermata, moving between units, suits intrinsic safety. The IS-04Z1 is designed around intrinsic safety for Zone 1 and Zone 21.

The route · distribution

Distributing the IS-04Z1 in Italy

A distributor for Italy would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.

What SAMS looks for in a partner

Operator relationships
Existing supplier registrations or a clear route to them with the main operators and contractors in Italy.
Ex-competent staff
People who understand zone classification, markings and the conditions of a certificate.

And equally important

Local-language support
Documentation, training and helpdesk in the languages the workforce uses.
Service capability
Spares, battery replacement and repair routed through SAMS-approved channels.
Questions · Italy

Frequently asked questions

Can we buy an explosion proof mobile phone in Italy today?

No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.

What does an explosion proof mobile phone in Italy cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

Is the IS-04Z1 explosion proof or intrinsically safe?

It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.

Which sites in Italy does this cover?

The market guide for Italy covers Priolo, Melilli and Augusta, Gela, Milazzo, Sarroch, among others. Site-level pages are linked below.

How do I become a SAMS distributor for Italy?

Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Italy.

Does Italy require ATEX certified phones in hazardous areas?

Italy applies ATEX Directive 2014/34/EU as an EU member, and employers zone workplaces under Directive 1999/92/EC. Devices for Zone 1 and Zone 2 should carry CE and Ex markings with Italian-language instructions where required. Operators usually add their own approval and permit procedures.

Where is upstream hazardous-area work in Italy?

The Val d'Agri area in Basilicata hosts the largest onshore hydrocarbon field in Europe, and the Po Valley and offshore Adriatic hold moderate gas reserves. Refineries, fuel terminals and gas stations add downstream sites. Confirm site lists with the operator.

Can a device be trialled during a fermata?

The market guide says teams can test a unit through a fermata while certification runs. Trial terms and site access are set by the plant operator, and a unit would need to be accepted for the zones it enters. Ask the operator's HSE team before arranging a trial.

Enquiry · Italy

Ask about the IS-04Z1 for Italy

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Italy

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Italy?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.