Hungary: rules and approvals
Under ATEX, Category 3 equipment may be self-certified by the manufacturer with a technical dossier, while Category 1 and 2 usually involve a notified body, which affects what Hungarian buyers should ask for.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for Hungarian refinery units, polymer plants, pharmaceutical solvent areas and gas installations. This page sets out how an IECEx smartphone supply route to Hungary will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for Hungary cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Hungary: Budapest, Algyő, Százhalombatta | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Hungary. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Hungary market guide.
Under ATEX, Category 3 equipment may be self-certified by the manufacturer with a technical dossier, while Category 1 and 2 usually involve a notified body, which affects what Hungarian buyers should ask for.
The Arad-Szeged natural gas pipeline connects Romania and Hungary, so border compressor and metering stations belong to the national gas network.
Wanhua-BorsodChem, based at Kazincbarcika in north-east Hungary, produces isocyanates (MDI and TDI), PVC and chlor-alkali products, and is a major chemical employer for plant maintenance and shutdown contractors.
MOL was established on 1 October 1991 as the legal successor of nine members of the National Oil and Gas Trust, which dated from 1957, giving Hungary a long industrial oil and gas history.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Hungary. Hungarian sites such as Százhalombatta, Tiszaújváros and Kazincbarcika use contractors who also work in other countries. For them the IECEx scheme is a familiar reference, with a certificate of conformity naming the equipment and a schedule of conditions setting conditions of use. IECEx certification for the IS-04Z1 is in progress; none can be cited yet.
Nothing can be bought for Hungary today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Hungary covers Százhalombatta, Tiszaújváros, Kazincbarcika, Dorog, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Hungarian is the working language, and ATEX instructions are typically expected in the language of the destination country. Providing Hungarian instructions with the certificate pack often helps, though international operators may also accept English. Check with the site safety office.
Hungary is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to workplace zoning. Zone 1 and Zone 2 devices should carry CE and Ex markings with instructions in the local language. Operators usually add their own permit and registration rules.
ATEX is the usual reference in the EU, and Hungary applies it through national law. Some operators or international contractors also ask for IECEx. Ask the operator's HSE or explosion-protection lead which evidence they accept before ordering.
Other guides for Hungary, other places in Hungary, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.