Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Egypt · IECEx

IECEx Smartphone Supplier in Egypt

The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in Egypt every shift: Gulf of Suez platform crews, LNG terminal operators, refinery engineers and the HSE and telecoms teams who equip them. Buyers searching for an IECEx smartphone supplier for Egypt can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Egypt, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceSmartphone
RouteSupply
WhereEgypt

Short answer. An IECEx smartphone for Egypt cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx smartphone for Egypt

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesEgypt: Suez, Alexandria / Amreya, Gulf of SuezClassified by the site operator
Product · Egypt

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Egypt. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Egypt

Where this applies in Egypt

The classified areas, operators and sites below are the ones covered in the SAMS Egypt market guide.

Operators, EPCs and contractors

Egyptian General Petroleum Corporation
EGPC — state operator overseeing exploration, refining and distribution
Egyptian Natural Gas Holding Company
EGAS — upstream and midstream gas sector holding company
Eni / Petrobel & Petroshorouk
Operator of the Zohr field, the largest gas discovery in the Mediterranean
GASCO
Egyptian Natural Gas Company — gas processing and transmission network
Egyptian LNG (ELNG)
Idku LNG liquefaction and export terminal
SEGAS
Damietta LNG liquefaction terminal

Industrial areas and sites

Gulf of Suez
Offshore platforms and onshore terminals: Ras Gharib, Ras Shukheir and Zeit Bay
Zohr field
Deepwater gas development in the Egyptian Mediterranean
Idku
ELNG liquefaction trains and export jetty on the Mediterranean coast
Damietta
SEGAS LNG terminal east of the Nile Delta
Suez
Refining complex and the southern end of the Suez Canal Economic Zone
Alexandria / Amreya
Refining and petrochemical cluster on the Mediterranean coast
Field notes · Egypt

More about Egypt that matters for portable equipment

Egypt: industry on the ground

Egypt's LNG plants at Damietta and Idku are operated by Egyptian LNG and SEGAS LNG, and gas supplied 84 per cent of Egypt's electricity in 2023.

Egypt: infrastructure

The Arab Gas Pipeline was developed to carry gas to Jordan, Syria and Lebanon, with a planned total length of 1,200 kilometres, showing how pipeline and compressor sites extend beyond the Delta.

Egypt: projects and investment

Zohr, found by Eni in 2015 in the Shorouk Block 190 kilometres north of Port Said, holds an estimated 30 trillion cubic feet of gas, and production began in December 2017.

Egypt: rules and approvals

Electrical safety and general product conformity are overseen separately by the Egyptian Organization for Standardization and Quality and the General Organization for Export and Import Control.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In Egypt. IECEx is the technical basis EGPC and its operating affiliates work from, and it is the link to international operators such as Eni at Zohr and to contractors at Idku and Damietta. The reviewer reads the certificate of conformity and the schedule of conditions. EOS conformity and NTRA radio approval are separate, and none of the three is finished.

The route · supply

Sourcing the IS-04Z1 for Egypt

Supply of the IS-04Z1 to Egypt starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · Egypt

Frequently asked questions

Can we buy an IECEx smartphone in Egypt today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does an IECEx smartphone in Egypt cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

Which sites in Egypt does this cover?

The market guide for Egypt covers Gulf of Suez, Zohr field, Idku, Damietta, among others. Site-level pages are linked below.

How will SAMS supply Egypt?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

How should devices be specified for Egypt's desert sites?

Western Desert and Gulf of Suez sites typically combine high summer heat, dust and wind-blown sand, with salt air on the coast. Check the operating temperature range, dust ingress rating and enclosure corrosion resistance, and confirm any site limits with the operator or contractor.

Does Egypt separate electrical safety from telecom approval?

Yes. NTRA covers radio and telecom approval, while the Egyptian Organization for Standardization and Quality and the General Organization for Export and Import Control cover electrical safety and general product conformity. A device with batteries or chargers may need to satisfy both, so check each body's scope.

Is EOS conformity enough for EGPC or Eni sites?

No: EGPC and its operating affiliates, along with international operators like Eni, each run vendor-registration and engineering-approval processes, so conformity alone does not guarantee listing. EOS and NTRA approvals are being pursued and are not finished. Confirm the route with the operator's procurement team.

Enquiry · Egypt

Ask about the IS-04Z1 for Egypt

Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.

Enquiry · Egypt

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Egypt?

Name the site and the operator and we will send what is available before launch.