NNPC: logistics and access
NNPC delivered its first delivered-ex-ship LNG cargo to Futtsu in Japan in June 2024, showing an export chain that runs from Nigerian gas fields through liquefaction to ships.
In September 2022 NNPC took over Oando's OVH Energy business and its 380 filling stations, adding retail fuel sites, where forecourt hazardous areas also apply. It manages joint ventures with international oil companies and has refining, pipeline, gas and petrochemical interests. This page explains what to look for in an IECEx smartphone for NNPC, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for NNPC: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | NNPC: Refinery process units, Oil and gas production facilities, Pipelines and storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Nigeria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
Suppliers and contractors register on the Nigerian Petroleum Exchange (NipeX), which is linked to NNPC tendering and vendor pre-qualification; local-content registration with the regulator and NCDMB is also required for work in the sector. Confirm current requirements with NNPC. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
NNPC delivered its first delivered-ex-ship LNG cargo to Futtsu in Japan in June 2024, showing an export chain that runs from Nigerian gas fields through liquefaction to ships.
NNPC was converted from a corporation into a limited liability company in July 2022 under the Petroleum Industry Act of 2021, so it now runs as a commercial entity rather than a ministry-style body.
The headquarters is NNPC Towers on Herbert Macaulay Way in Abuja's Central Business District, a complex of four identical towers, with zonal offices in Lagos, Kaduna, Benin City, Port Harcourt and Warri.
Since its 1988 commercialisation the group has covered exploration and production, gas development, refining, distribution, petrochemicals, engineering and commercial investments through strategic business units.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In NNPC. NNPC manages joint ventures with international oil companies, and those partners and their contractors commonly work from IECEx documents. They look for a certificate of conformity and its schedule of conditions. IECEx is a target for the IS-04Z1 and remains in progress, so treat it as a planned route and not a held approval.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Suppliers and contractors register on the Nigerian Petroleum Exchange (NipeX), which is linked to NNPC tendering and vendor pre-qualification; local-content registration with the regulator and NCDMB is also required for work in the sector. Confirm current requirements with NNPC.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
NNPC works through business units and joint ventures, so the entry point depends on the site. Typically you identify the unit (upstream, gas, refining or retail), contact its HSE and procurement teams, and ask for current approved-vendor requirements. Confirm the route with NNPC itself before quoting.
Fuel dispensing areas generally have classified zones around pumps, vent pipes and tank fill points, usually Zone 1 or Zone 2 with defined radii. Local rules apply, so confirm the station's area classification and any phone-use policy with the retail operator before deploying devices.
Heat and humidity reduce battery life, and IP68 sealing helps with rain and dust but is not explosion protection. Plan charging in safe areas, keep spare batteries, and test in local conditions. Ask each site's HSE team how portable devices may be charged and stored.
Other guides for NNPC, other places in Nigeria, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.