Ma'aden: industry on the ground
The Wa'ad Al-Shamal phosphate complex in northern Saudi Arabia covers mining, beneficiation, ammonia and phosphoric acid production, and finished diammonium phosphate fertiliser for export.
Ma'aden grew from a single-mine gold producer established in 1997 into a diversified mining and processing group listed on Tadawul, with the Public Investment Fund as its main shareholder. Its aluminium business mines bauxite at Al Ba'itha and smelts and rolls aluminium at Ras Al Khair, producing over 1 million tonnes a year; it also produces phosphate fertiliser, gold and base metals. If you are specifying an IECEx smartphone for Ma'aden, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Ma'aden: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Ma'aden: Fuel and gas handling, Ammonia and phosphate fertiliser plants, Acid plants | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Saudi Arabia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main sites and the hazardous-area types a portable device is likely to meet at this organisation.
Ma'aden runs its own supplier portal (maaden.com/supplier-portal) where new suppliers create a supplier profile, and contractor manpower is managed through a separate Fieldglass link. Confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
The Wa'ad Al-Shamal phosphate complex in northern Saudi Arabia covers mining, beneficiation, ammonia and phosphoric acid production, and finished diammonium phosphate fertiliser for export.
The aluminium chain runs from bauxite mining at Al-Ba'itha through the alumina refinery to the smelter and casthouse at Ras Al-Khair, using the Ma'aden Bauxite and Alumina and Ma'aden Aluminium companies.
Industrial minerals such as kaolin, low-grade bauxite and magnesia are also produced for the domestic construction and manufacturing markets.
The aluminium joint venture was set up in 2009 with Alcoa; in 2025 Alcoa sold its 25.1 per cent interest to Ma'aden, ending the joint venture, so Ma'aden now owns those companies.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Ma'aden. With processing complexes such as Ras Al-Khair and Wa'ad Al Shamal, Ma'aden works with international EPCs and process licensors, many of whom use IECEx documents. A reviewer should read the certificate of conformity together with its schedule of conditions. The IS-04Z1 is designed for IECEx and certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Ma'aden runs its own supplier portal (maaden.com/supplier-portal) where new suppliers create a supplier profile, and contractor manpower is managed through a separate Fieldglass link. Confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Fertiliser and aluminium complexes typically include ammonia and acid plants, fuel and gas handling, coal or fuel-fired power units, and fine process dust areas, while mines add diesel storage and blasting-related zones. Ma'aden classifies each facility, so request the area drawing, gas or dust group and temperature class.
Ma'aden and its operating subsidiaries set site HSE and electrical rules, and projects are often run through contractors who apply them. Confirm with the relevant Ma'aden business unit's procurement and HSE teams which certificates, supplier registration and permits are needed before you ship equipment.
No. Hazardous classification is limited to the parts of a site where flammable gas, vapour or dust can be present, such as ammonia, acid and fuel and gas handling areas. Ma'aden's engineers decide which areas are classified, so confirm with the site operator. The IS-04Z1 has no certificate yet.
More on Ma'aden, and on other places in Saudi Arabia.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.