United Arab Emirates: rules and approvals
TDRA type approval certificates last three years, need no local representative but a compliance mark, and a valid supplier registration is required.
The IS-04Z1 is a Zone 1 and Zone 21 handset for UAE field crews and the people who equip them: offshore operators, maintenance technicians, HSE advisers and telecoms teams. The UAE stretches more than 650 km along the southern shore of the Persian Gulf, and most of the coast consists of salt pans that extend far inland. An IECEx smartphone distributor in United Arab Emirates would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. United Arab Emirates has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | United Arab Emirates: Das Island, Zirku Island, Upper Zakum | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United Arab Emirates. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS United Arab Emirates market guide.
TDRA type approval certificates last three years, need no local representative but a compliance mark, and a valid supplier registration is required.
Ruwais, now often called Al Dhannah and about 240 km west of Abu Dhabi, is an ADNOC industrial complex centred on a refinery inaugurated in 1982, with gas processing, fertiliser and petrochemical plants.
Port of Fujairah on the Gulf of Oman is the world's second-largest bunkering hub, with two oil terminals commissioned in 2006 and 2010.
The total area is about 83,600 square kilometres, and south and west of Abu Dhabi vast sand dunes merge into the Rub al Khali.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In United Arab Emirates. IECEx matters in the UAE because ADNOC, Borouge, ENOC and the fabrication yards work with international partners and visiting contractors who read the international scheme. A certificate of conformity with its schedule of conditions would give them a common reference. For the IS-04Z1, IECEx certification is in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for United Arab Emirates. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for United Arab Emirates covers Ruwais, Habshan, Das Island, Zirku Island, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for United Arab Emirates.
The Ministry of Industry and Advanced Technology handles safety declarations of conformity, listed as valid for one year with a local representative required. This is separate from the TDRA telecom approval, so ask your supplier to confirm both.
Ruwais and the Abu Dhabi oil and gas fields, Fujairah's oil terminals, Jebel Ali in Dubai, with its power, desalination and aluminium smelter complex. Each belongs to a different operator.
It is designed with a 4,000 mAh battery and a fully sealed body to stay in service until the next rotation, since there is no same-day replacement. Certification is in progress. Confirm area classification and permit rules with the operator before any use.
Related guides for United Arab Emirates and for United Arab Emirates.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.