Access
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
The UAE's main offshore oil and gas fields lie in the Arabian Gulf off Abu Dhabi. Upper Zakum, discovered in 1963 and on stream since 1977, is operated as part of ADNOC Offshore (formerly ZADCO), with offshore output handled at island facilities such as Das Island and Zirku Island. Distribution partners for UAE offshore fields are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. UAE offshore fields has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | UAE offshore fields: Platform and subsea pipelines, Marine loading terminals, Offshore production platforms and islands | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Offshore. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Das Island lies about 160 km north-west of the UAE mainland and is staffed by about 6,000 oil and gas personnel on a rotational schedule, so access is by operator-controlled sea and air transport.
Desert marine climate; Zirku Island summer temperatures are typically 35 to 45 degrees C with high humidity.
Abu Dhabi's first offshore drilling platform was established at Umm Shaif in 1958, and the first crude export left Das Island in 1962.
ADNOC Drilling has been contracted to supply island rigs for wells on existing and new artificial islands at Zakum, with delivery expected from 2026.
Replacement of a 125 km oil pipeline from Umm Lulu to Zirku Island has been awarded as an offshore project, so subsea and island pipeline work is under way.
Zakum's artificial islands suit extended-reach drilling, and the five longest wells in the world are reported to have been drilled there.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In UAE offshore fields. Offshore crews and contractors often work for international firms, and some fields have international shareholders. IECEx gives them a shared reference, with a certificate of conformity and schedule of conditions to read together. SAMS has no IECEx certificate for the IS-04Z1; certification is in progress.
A distributor for UAE offshore fields would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are offshore production platforms and islands, island processing and terminals, platform and subsea pipelines, marine loading terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for UAE offshore fields.
Upper Zakum is about 84 km north-west of the Abu Dhabi islands, and operations are based on islands such as Zirku and Das. Access is by boat or helicopter under the operator's control, so plan transit time and baggage limits for equipment.
Often the same standards apply, but offshore and island sites usually add stricter controls on ignition sources, wireless devices and marine transport. Approval is decided by the operator, so ask for its current equipment, certification and wireless policy before shipping devices.
Offshore crews rotate and sites are reached by sea and air under operator control. A phone would normally be enrolled in the employer's or operator's EMM or MDM. The IS-04Z1 is designed for EMM/MDM. Ask the operator how devices are issued, charged and handed over.
Related guides for UAE Offshore and for United Arab Emirates.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.