Romania: infrastructure
Two reactors at Cernavodă generate about 18-20% of Romanian electricity, and the country also has substantial coal deposits and considerable hydroelectric capacity, so mines, dams and power plants all feature.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for Romanian refineries, well sites, gas plants and port terminals rather than for an office. Gas production is around 25 million cubic metres a day, with about 100 billion cubic metres of onshore reserves and an estimated 40 billion offshore, so both Carpathian-area fields and Black Sea sites matter. Distribution partners for Romania are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Romania has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Romania: Constanța, Vadu and Corbu, Borzești and Onești | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Romania. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Romania market guide.
Two reactors at Cernavodă generate about 18-20% of Romanian electricity, and the country also has substantial coal deposits and considerable hydroelectric capacity, so mines, dams and power plants all feature.
Romania had five refineries left by 2018 with about 13.7 million tonnes a year of capacity, far above domestic demand, and exports lubricants, bitumen, fertilisers and petrochemicals across the region.
Neptun Deep, about 160 km off the Romanian coast in 100 to 1,000 m of water, is owned 50/50 by OMV Petrom and Romgaz, is budgeted at about 4 billion euros and targets 8 billion cubic metres of gas a year.
The national gas transmission system is owned by the state company Transgaz and interconnector pipelines link Romania with Hungary, Bulgaria and Ukraine, so border compressor and metering stations are part of the network.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Romania. IECEx matters in Romania chiefly through the international groups and visiting contractors that work beside OMV Petrom, Romgaz and Rompetrol Rafinare during projects such as Neptun Deep. A certificate of conformity with its schedule of conditions would let their safety teams compare the handset against a common reference. That certificate is still in progress for the IS-04Z1.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Romania. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Romania covers Ploiești and Brazi, Năvodari, Constanța, Vadu and Corbu, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Romania.
Continental winters can bring sub-zero temperatures, which cut battery capacity and can make touchscreens harder to use with gloves. Check the lowest rated ambient temperature on the certificate and plan spare batteries and warm storage for outdoor work at pipeline stations and refineries.
Refineries, gas fields and compressor stations, Black Sea offshore fields, chemical works and power plants are the main examples. Five refineries remained by 2018 with spare capacity for export. Confirm site lists with each operator and ask for its zone drawings.
It is designed with four-constellation GNSS, 4G LTE and Wi-Fi so a lone worker at a well site or compressor station can be located and stay connected. Real coverage depends on the mobile network at the site, so test it on your own field route during an evaluation.
Other guides for Romania, other places in Romania, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.