Pakistan: industry on the ground
The Thar coalfield in Sindh covers over 9,000 square kilometres and holds an estimated 200 billion tonnes of lignite; the Sindh Engro Coal Mining Company is the principal mining operator there.
A Zone 1 / Zone 21 smartphone for crews on the gas fields of Sindh and Balochistan, the refineries at Karachi, Attock and Mahmood Kot, the LNG terminals at Port Qasim and the fertiliser plants. Pakistan's first gas field was found near Sui in Balochistan in 1952, and the Sui area remains a name associated with the country's gas supply and upstream classified-area work. An IECEx smartphone distributor in Pakistan would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Pakistan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Pakistan: Port Qasim, Karachi, Korangi, Karachi, Hub, Balochistan | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pakistan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Pakistan market guide.
The Thar coalfield in Sindh covers over 9,000 square kilometres and holds an estimated 200 billion tonnes of lignite; the Sindh Engro Coal Mining Company is the principal mining operator there.
The Toot oil field in Punjab, about 135 km south-west of Islamabad, saw its first well in 1964 and commercial production from 1967, showing that upstream work also happens in the inland north.
Oil production was confined to Punjab until 1981, when a company found the first field in Lower Sindh; by 1998-99 the Lower Sindh gas fields produced more oil than Punjab.
Domestic refining typically meets about 60% of Pakistan's diesel, 30% of motor gasoline and all jet fuel demand, so the rest arrives as imports through port terminals.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Pakistan. Pakistan's operators work with international partners and contractors, and IECEx is the evidence that travels between them. Ask for the certificate of conformity with its schedule of conditions, which fix the marking and conditions of use. The certification programme is in progress, no certificate exists yet, and PTA approval for the radio is a separate step.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Pakistan. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Pakistan covers Sui, Balochistan, Daharki and Ghotki, Sindh, Port Qasim, Karachi, Korangi, Karachi, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Pakistan.
Examples include the Sui gas area in Balochistan, the Toot field in Punjab, Lower Sindh gas fields and the five main refineries. Which areas are classified, and to what zone, is decided by each operator, so ask for its hazardous-area drawings.
Operators commonly ask for recognised international certification such as IECEx or ATEX against IEC 60079, but acceptance is set site by site. Request the operator's equipment approval procedure and provide certificates, marking details and manufacturer instructions with your submission.
Coverage depends on the carrier, not the handset. The device is designed to fall back to plant Wi-Fi where the signal is thin, but that depends on the site's network. Confirm with the field operator what connectivity is available before relying on it for work orders.
More on Pakistan, and on other places in Pakistan.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.