New Zealand: people and language
Hazardous-area inspections are done by suitably registered inspectors working to AS/NZS 60079.17 and AS/NZS 3000, with a verification dossier and records kept, so documents for any device should be easy to supply.
The IS-04Z1 is an intrinsically safe handset for people who cross into classified areas in New Zealand every shift: Taranaki gas-field operators, methanol and fertiliser plant crews, dairy-processing engineers managing milk-powder dust risk, and the HSE and telecoms teams who equip them. About 2,600 km of high-pressure gas transmission pipeline runs in the North Island, led by the 307 km Maui pipeline carrying 78% of production; there is no gas transmission in the South Island. Distribution partners for New Zealand are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. New Zealand has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | New Zealand: Marsden Point, Dairy processing sites nationwide, Taranaki | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in New Zealand. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS New Zealand market guide covers.
Hazardous-area inspections are done by suitably registered inspectors working to AS/NZS 60079.17 and AS/NZS 3000, with a verification dossier and records kept, so documents for any device should be easy to supply.
The Marsden Point refinery operated from 1964 to 2022 and the site now imports refined fuel, about half from South Korea and about a third from Singapore as of 2025, so tank and terminal work continues there.
Gas-based plants developed from the 1970s included an ammonia-urea plant at Kapuni, methanol at Waitara, synthetic petrol at Motunui and gas-fired power stations at New Plymouth and Huntly; confirm each site's current status.
AS/NZS 60079 is the Australia and New Zealand adoption of the IEC 60079 series, covering classification, selection, installation, inspection and repair of electrical equipment in explosive atmospheres.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In New Zealand. New Zealand's gas and methanol plants include operators with international parents, such as OMV New Zealand, and contractors who work across several countries. IECEx is the shared language for them. Ask for the certificate of conformity with its schedule of conditions to see the exact marking and limits, since no certificate is yet issued for this device.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for New Zealand yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for New Zealand covers Taranaki, Motunui / Waitara Valley, Kapuni, Marsden Point, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for New Zealand.
Electrical equipment for explosive atmospheres is generally selected and inspected to AS/NZS 60079, the local adoption of the IEC 60079 series, alongside AS/NZS 3000 for installations. IECEx certificates are widely accepted as evidence, but confirm the exact requirement with the site operator or your inspector.
Inspectors typically look for equipment marking suited to the zone, the certificate or verification dossier, and a record of inspection under AS/NZS 60079.17. Keep the certificate number, marking photo and any manufacturer instructions with the asset register entry.
The battery is sized for a working day of plant rounds, but real life depends on use of camera, GNSS and radio. There is no recharge point inside a classified area, so plan to charge in a safe area. Test the device on your own round before relying on it.
More on New Zealand, and on other places in New Zealand.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.