Inland site
Mathura is inland and is supplied with crude through the Salaya-Mathura pipeline, a 2,663 km line from the Gujarat coast, so there is no marine terminal.
Mathura in Uttar Pradesh is home to Indian Oil's inland refinery, commissioned on 19 January 1982 and now processing 8 million tonnes of crude a year. Process units and product storage define its Zone 1 areas. Distribution partners for Mathura, Uttar Pradesh are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Mathura, Uttar Pradesh has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Mathura, Uttar Pradesh: Product loading gantries, Pipeline pumping stations, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Mathura India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Mathura is inland and is supplied with crude through the Salaya-Mathura pipeline, a 2,663 km line from the Gujarat coast, so there is no marine terminal.
The refinery processes low-sulphur Bombay High and Nigerian crudes and high-sulphur Middle East crude, and supplies BS VI fuels to the Delhi NCR region.
The refinery began producing BS VI standard fuels for Delhi NCR ahead of the April 2020 mandate, showing continuing upgrade work.
Mathura has a hot semi-arid climate, which means very hot summers and relatively low rainfall.
The refinery received the Best of All Rajiv Gandhi National Quality Award in 1998, and a corporate postal stamp was issued for its environmental contribution.
Mathura Refinery, Indian Oil's sixth refinery, was commissioned on 19 January 1982 after construction began in October 1972, so its older units are over 40 years old.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Mathura, Uttar Pradesh. Mathura's refinery uses specialist contractors for shutdowns, many familiar with international documents. An IECEx certificate of conformity with its schedule of conditions is a reference they compare across projects. SAMS is pursuing IECEx for the IS-04Z1, and nothing has been issued.
A distributor for Mathura, Uttar Pradesh would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, crude and product tank farms, product loading gantries, pipeline pumping stations. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Mathura, Uttar Pradesh.
Mathura is 162 kilometres south-east of Delhi, so most visitors fly into Delhi and continue by road or rail. Agree gate access, security passes and induction times with the operator well before travelling.
The refinery was commissioned in 1982 and expanded in 1989, so units of different ages may have different layouts and classifications. Ask the operator for the current classification of each unit you visit.
It removes jetty and ship-loading areas, but process units, tank farms, loading gantries and pipeline pumping stations remain classified. Check the classification of each area you work in. Confirm with the operator which of these areas allow handheld devices.
More on Mathura India, and on other places in India.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.