Canada: background
The Great Canadian Oil Sands plant, now part of Suncor, opened in 1967, and Fort McMurray's growth took off as further oil sands plants followed after the 1970s energy crises.
The IS-04Z1 is an Ex phone for people working inside classified areas at Canadian oil sands plants, gas plants, refineries and offshore platforms. Hazardous locations in Canada fall under Section 18 of the Canadian Electrical Code Part I, which uses the Zone system, while the older Class and Division rules are kept in Annex J for existing installations. Distribution partners for Canada are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Canada has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Canada: Alberta Industrial Heartland, Montney and Duvernay, Sarnia Chemical Valley | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Canada. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Canada market guide covers.
The Great Canadian Oil Sands plant, now part of Suncor, opened in 1967, and Fort McMurray's growth took off as further oil sands plants followed after the 1970s energy crises.
Zone approval in Canada uses the CAN/CSA C22.2 No. 60079 series, and an existing IECEx certificate with test reports can shorten the work, because mainly the national differences then have to be addressed.
Fort McMurray sits in the middle of the Athabasca oil sands, 435 km north-east of Edmonton on Highway 63, surrounded by boreal forest, so access is largely by one road or by air.
Radio and wireless devices sold in Canada need ISED certification against the Radio Standards Specifications, such as RSS-247 for Wi-Fi and Bluetooth and RSS-Gen for general requirements and labelling.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Canada. IECEx is the scheme visiting international operators and EPCs may bring to Canada, from Kitimat LNG to the Grand Banks, but Rule 18-050 requires equipment certified by a body accredited by the Standards Council of Canada. The certificate of conformity and schedule of conditions would be read alongside that. Nothing has been issued yet.
A distributor for Canada would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Canada covers Athabasca oil sands, Cold Lake and the Lakeland, Alberta Industrial Heartland, Montney and Duvernay, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Canada.
Devices with Wi-Fi, Bluetooth or cellular radios generally need ISED certification and must meet the applicable Radio Standards Specifications, along with interference limits such as ICES-003. A certification body recognised by ISED can issue it. Confirm the exact requirements for your device with ISED or an accredited body.
The Canadian Electrical Code now uses Zones in Section 18, while Class and Division rules remain in Annex J for existing installations, so older plants may still be classified by Division. Check the classification drawing for the area and make sure the device marking matches the system used there.
The marking target is II 2 G Ex ib IIC T4, with Class I Division 1 pursued on the same intrinsic safety basis. Nothing has been issued: certification is in progress. Canadian Section 18 classifies by Zone while Annex J18 keeps Division. Check which system your site's drawings use before anything is specified.
Other guides for Canada, other places in Canada, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.