KazMunayGas: background
KazMunayGas was created by presidential decree in February 2002 by merging Kazakhoil and Oil & Gas Transportation, so it combines upstream production with pipeline and transport operations in one national group.
KazMunayGas is Kazakhstan's national oil and gas company, formed in 2002 and headquartered in Astana. It has upstream, transport and refining interests, including the Atyrau and Pavlodar refineries, a 50% stake in the Shymkent refinery and a 20% stake in Tengizchevroil. Buyers searching for an IECEx mobile phone supplier for KazMunayGas can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx mobile phone for KazMunayGas cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | KazMunayGas: Refinery process units, Oil and gas production facilities, Pipeline stations | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kazakhstan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
KazMunayGas was created by presidential decree in February 2002 by merging Kazakhoil and Oil & Gas Transportation, so it combines upstream production with pipeline and transport operations in one national group.
The company holds a 20% share in the Tengizchevroil joint venture, so equipment and contractor standards at Tengiz are partly shaped by international partners as well as the national company.
Its upstream arms include KazMunaiGas Exploration Production for onshore fields and KazMunayTeniz for offshore oil and gas, so site rules can differ between the land and Caspian offshore businesses.
Support functions such as helicopter services (Eurasia-Air) and catering and camp support (KazMunaiGas Services Compass) sit inside the group, so remote-site crews often work under group logistics rules.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In KazMunayGas. KazMunayGas has a joint-venture refinery and interests alongside international partners, so international contractors and licensors often arrive with IECEx documents. Reviewers there would look for a certificate of conformity with its schedule of conditions. IECEx is a target for the IS-04Z1 and is in progress, so treat it as a planned route and not a held approval.
Nothing can be bought for KazMunayGas today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
It depends on where the devices will be used. Onshore field teams, offshore Caspian crews, gas transport and refining each run separate units with their own procurement. Typically you start with the unit's HSE and instrumentation groups and confirm requirements with the operator before any trial.
Generally yes. Onshore fields in western Kazakhstan face cold winters and hot summers with dust, while offshore units add salt air and limited space. Zone classification is set per installation, so ask the unit for its area classification drawings before choosing handheld equipment.
Equipment approval is run by the organisation itself, and the group structure may have changed, so ask which legal entity operates the site in question. Its procurement and HSE teams will state the evidence they require. The IS-04Z1 has no certificate yet, so share only the datasheet and target marking.
Other guides for KazMunayGas, other places in Kazakhstan, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.