Saudi Aramco: industry on the ground
In 2024 Aramco's oil and gas production totalled 12.7 million barrels of oil equivalent a day, and its headquarters are in Dhahran in the Eastern Province.
The Saudi government took a one-quarter share of Aramco's assets in 1973, raised it to sixty per cent in 1974, and the company was fully managed by the Kingdom from 1988 onward. Its facilities include Ghawar, Safaniya, Abqaiq, Ras Tanura, Jubail and Yanbu. This page explains what to look for in an IECEx mobile phone for Saudi Aramco, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Saudi Aramco: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Saudi Aramco: Export terminals, Oil and gas fields, Gas processing | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Saudi Arabia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main sites and the hazardous-area types a portable device is likely to meet at this organisation.
Aramco requires suppliers to register through its e-Marketplace Platform, handled by its Dhahran office for Saudi-based and many regional suppliers; registration and qualification do not guarantee business. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
In 2024 Aramco's oil and gas production totalled 12.7 million barrels of oil equivalent a day, and its headquarters are in Dhahran in the Eastern Province.
Aramco's joint ventures and affiliates include SATORP, Petro Rabigh, Yasref, SASREF and Luberef, and it holds a 70 per cent share of SABIC, so refining and chemicals sit beside upstream work.
Dammam No. 7 struck oil in 1938 and became the first commercial oil well in Saudi Arabia, starting the development of the Eastern Province fields that Aramco still runs.
Aramco manages more than one hundred oil and gas fields in Saudi Arabia, including the Ghawar field in the Eastern Province, and had gas reserves of 288.4 trillion standard cubic feet.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Saudi Aramco. Aramco works with international operators, EPCs and service companies from Ghawar to Ras Tanura. IECEx is a familiar reference for them. A reviewer should read the certificate of conformity and the schedule of conditions together. The IS-04Z1 is designed for IECEx, but certification is still in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Aramco requires suppliers to register through its e-Marketplace Platform, handled by its Dhahran office for Saudi-based and many regional suppliers; registration and qualification do not guarantee business.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
These ventures are run as separate companies with their own site HSE rules and supplier lists, although they often follow Aramco-derived specifications. Confirm with the specific joint venture's procurement and HSE teams, because approval at Aramco does not automatically give access to its affiliates.
Typically wellsites, gas-oil separation plants, gas processing plants, refineries, tank farms and loading terminals, and offshore platforms. Aramco classifies every facility under its own engineering standards, so request the hazardous-area drawing and the gas group and temperature class before choosing a phone or tablet.
Only if the final certificate, gas group and temperature class suit the platform area and the operator permits it. The IS-04Z1 is designed for intrinsically safe handheld use with IP68 protection, but no certificate has been issued. Offshore connectivity and charging need planning too.
Related guides for Saudi Aramco and for Saudi Arabia.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.