PetroSA: rules and approvals
In 2020 the Cabinet approved merging PetroSA with the Strategic Fuel Fund and iGas to form a new national petroleum company, so organisational names and contacts may change; check the current entity.
The Petroleum Agency of South Africa (PASA) is the state regulator for onshore and offshore oil and gas exploration, and was split out of Soekor when PetroSA was created. It owns the Mossel Bay gas-to-liquids refinery and the offshore FA platform and gas fields of the Bredasdorp Basin that fed it. This page explains what to look for in an IECEx mobile phone for PetroSA, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for PetroSA: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | PetroSA: Gas-to-liquids process units, Offshore platforms, Gas and condensate handling | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in South Africa. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
PetroSA lists a supplier procurement portal on its website (procurement.petrosa.com); confirm current registration and equipment approval requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
In 2020 the Cabinet approved merging PetroSA with the Strategic Fuel Fund and iGas to form a new national petroleum company, so organisational names and contacts may change; check the current entity.
Its gas-to-liquids refinery at Mossel Bay has a capacity of about 45,000 barrels a day and converts gas and condensate into liquid fuels and chemicals, a process plant with gas and liquid hazards.
PetroSA was formed in January 2002 by merging Mossgas, Soekor and parts of the Strategic Fuel Fund Association, and was launched by President Thabo Mbeki that year.
The Oribi field, discovered in 1990, was the first oilfield development in South Africa, operated by Soekor before it merged into PetroSA.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In PetroSA. If international EPCs or specialist contractors work on the Mossel Bay gas-to-liquids refinery or the offshore FA platform, IECEx documentation is a common reference. A reviewer should read the certificate of conformity with its schedule of conditions. The IS-04Z1 is designed for IECEx, and certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
PetroSA lists a supplier procurement portal on its website (procurement.petrosa.com); confirm current registration and equipment approval requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
The Cabinet approved a merger of PetroSA with the Strategic Fuel Fund and iGas in 2020 to form a new national petroleum company. Supplier registration details and contacts can change with such restructuring, so confirm the current legal entity and procurement portal before submitting any documents.
The Petroleum Agency of South Africa regulates onshore and offshore oil and gas exploration. It does not certify handheld equipment itself, so Ex certification questions are normally handled through the operator's own standards and South African electrical and mine or plant safety rules. Confirm requirements with PetroSA.
The sheet says PetroSA lists a supplier procurement portal on its website, procurement.petrosa.com. Registration and equipment approval requirements should be confirmed with PetroSA's procurement and HSE teams, as they may change. The IS-04Z1 has no certificate yet, so it cannot be offered as certified equipment.
Related guides for PetroSA and for South Africa.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.