Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
North Oil Company · IECEx

IECEx Mobile Phone for North Oil Company

Kirkuk is reported to have three pay zones, with the Tertiary reservoir holding about 98 per cent of recoverable reserves, so production is concentrated in a small number of formations. It operates the Kirkuk, Bai Hassan, Jambur and Khabbaz fields, and a redevelopment contract for these fields was signed with bp in 2025. This page explains what to look for in an IECEx mobile phone for North Oil Company, and where the IS-04Z1 stands against that list today.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for North Oil Company, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceMobile Phone
RouteSpecification
WhereNorth Oil Company

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for North Oil Company: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx mobile phone for North Oil Company

What to check, and where the IS-04Z1 stands today
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesNorth Oil Company: Oil production facilities, Gas plants, Pipeline stationsClassified by the site operator
Product · Iraq

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Iraq. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The organisation · North Oil Company

Working with North Oil Company (NOC): sites and classified areas

The main sites and the hazardous-area types a portable device is likely to meet at this organisation.

Sites and areas

  • Kirkuk (Baba and Avanah domes)
  • Bai Hassan field
  • Jambur field
  • Khabbaz field

Classified areas

  • Oil production facilities
  • Gas plants
  • Pipeline stations
Supplier approval · North Oil Company

Becoming an approved supplier to North Oil Company

Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.

Field notes · North Oil Company

More about North Oil Company that matters for portable equipment

North Oil Company: projects and investment

The development and production contract covers an initial recovery of more than 3 billion barrels of oil equivalent from the Baba and Avanah domes of Kirkuk and the Bai Hassan, Jambur and Khabbaz fields.

North Oil Company: rules and approvals

Iraq's Communications and Media Commission handles type approval for radio equipment, with procedures following EU-style compliance and usually working through local registered partners.

North Oil Company: background

bp's activity in Iraq goes back to the 1920s, when it helped locate, produce and export oil from Baba Gurgur at Kirkuk, then the largest oilfield in the world.

North Oil Company: who works there

North Oil Company and North Gas Company are the current operators of the Kirkuk fields, with operatorship planned to move to an unincorporated organisation made up mainly of their own personnel.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In North Oil Company. Redevelopment of northern fields brings international engineering and service firms to Kirkuk, and they tend to work from IECEx paperwork. Their reviewers look for the certificate of conformity and its schedule of conditions. IECEx is a target for the IS-04Z1 and remains in progress, so North Oil Company staff should read it as a planned route rather than a held approval.

The route · specification

Specifying an IECEx mobile phone for North Oil Company

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · North Oil Company

Frequently asked questions

Can North Oil Company buy the IS-04Z1 today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does an IECEx mobile phone for North Oil Company cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

How does North Oil Company approve suppliers?

Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

Who currently operates the Kirkuk fields?

North Oil Company and North Gas Company are the current operators, and a planned transition would move operatorship to an unincorporated organisation made up mainly of their personnel. Supplier registration and equipment approval therefore stay with the Iraqi state companies; check current requirements with them.

What is the Kirkuk redevelopment contract?

A development and production contract covering the Baba and Avanah domes of Kirkuk and the Bai Hassan, Jambur and Khabbaz fields, with an initial resource of more than 3 billion barrels of oil equivalent. It means ongoing upgrades alongside operating plant, with many contractors on site.

Is the redevelopment contract likely to change who approves equipment?

It may bring international contractors with their own standards onto the northern fields, but equipment approval is still run by North Oil Company itself. Ask its procurement and HSE teams which paperwork they require, and do not assume a contractor's approval applies. The IS-04Z1 has no certificate yet.

Enquiry · North Oil Company

Ask about the IS-04Z1 for North Oil Company, Iraq

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · North Oil Company

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for North Oil Company?

Name the site and the operator and we will send what is available before launch.