Borouge: infrastructure
Borouge 4 includes a 1.5 million tonne ethane cracker, two Borstar polyethylene plants and a cross-linked polyethylene plant, so ethane and ethylene handling is central to the new units.
In September 2026 the new XLPE plant at Ruwais delivered its first customer batch after performance testing, adding 100,000 tonnes a year and doubling the group's XLPE output in the region. Since 31 March 2026 Borouge Plc has been part of Borouge Group International AG, formed from Borouge, Borealis and NOVA Chemicals. This page explains what to look for in an IECEx mobile phone for Borouge, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Borouge: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Borouge: Polyethylene and polypropylene plants, Cross-linked polyethylene (XLPE) plant, Polymer powder and pellet handling | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United Arab Emirates. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main sites and the hazardous-area types a portable device is likely to meet at this organisation.
Borouge's e-procurement page directs suppliers to register on the ADNOC Commercial Directory (not applicable in Asia Pacific, where the local Borouge office is the contact); confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
Borouge 4 includes a 1.5 million tonne ethane cracker, two Borstar polyethylene plants and a cross-linked polyethylene plant, so ethane and ethylene handling is central to the new units.
Upon expansion Borouge was expected to be the largest single-site polyolefin complex in the world, supplying feedstock to the nearby TA'ZIZ Industrial Chemicals Zone.
The business has two parts: Abu Dhabi Polymers Company, the production company in Abu Dhabi, and Borouge Pte Ltd, which is based in Singapore.
The Borouge 4 expansion at Ruwais, agreed in 2021 for about 6.2 billion US dollars, was designed to add 1.4 million tonnes a year of polyethylene.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Borouge. The Ruwais complex is being expanded through the Borouge 4 project, which draws international EPCs and construction contractors, many of whom know the IECEx scheme. A reviewer should read the certificate of conformity with its schedule of conditions. The IS-04Z1 is designed for IECEx, and certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Borouge's e-procurement page directs suppliers to register on the ADNOC Commercial Directory (not applicable in Asia Pacific, where the local Borouge office is the contact); confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Ruwais is a coastal desert location with high heat, humidity and salt, plus dust from pellet and powder handling. Check the operating temperature range, ingress protection and corrosion resistance of the enclosure, and confirm any area-specific limits with the operator before deploying equipment.
Ruwais is a shared industrial complex with several operators, and each company controls access and equipment rules inside its own plants. Check which entity operates the unit, because induction, hot-work permits and device approvals are set by that operator and not by the neighbouring facilities.
The sheet says Borouge points suppliers to the ADNOC Commercial Directory e-procurement page for registration. Requirements may change, and corporate structure changes were noted in 2026, so confirm with Borouge's procurement and HSE teams. The IS-04Z1 has no certificate yet.
Other guides for Borouge, other places in United Arab Emirates, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.