Basra Oil Company: geography and layout
The Rumaila field, split into North and South, lies around 30 km north of the Kuwait border, with proven reserves put at about 17 billion barrels, so it is one of the largest fields to plan for.
The Rumaila workforce is about 8,200 people, 93 per cent of them Iraqi, with training academies on site, so local crews and contractors carry most field work. It manages southern oil fields; PetroChina became West Qurna 1 operator in January 2024, and BOC was approved in January 2026 to manage West Qurna 2. This page explains what to look for in an IECEx mobile phone for Basra Oil Company, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Basra Oil Company: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Basra Oil Company: Oil production facilities, Gathering and pipeline systems, Field maintenance and support sites | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Iraq. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
The Rumaila field, split into North and South, lies around 30 km north of the Kuwait border, with proven reserves put at about 17 billion barrels, so it is one of the largest fields to plan for.
Zubair was discovered in 1948 and Rumaila in 1953, so surface facilities range from decades-old plant to recently modernised units.
Rumaila, Iraq's largest producing field, spans about 1,600 square km and lies roughly 50 km west of Basra, so sites are widely spread across open desert.
Iraq's Communications and Media Commission handles type approval; procedures follow EU-style compliance, usually through locally registered partners, so plan this before importing handsets.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Basra Oil Company. Southern Iraqi fields host international operators, service companies and visiting engineers who work from IECEx documents. Their reviewers look for a certificate of conformity and its schedule of conditions. The IS-04Z1 is targeting IECEx, which is in progress. Basra Oil Company should therefore regard it as a planned route, not an approval the product already holds.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Supplier registration and equipment approval are run by the organisation itself; confirm current requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
At Rumaila about 93 per cent of roughly 8,200 workers are Iraqi, and training academies operate on site. Arabic-language instructions and menus are therefore useful, alongside English for international contractors; check which language the operator requires for permits and gas alarms.
About 1,600 square km, roughly 50 km west of Basra. Facilities are spread across desert, so plan for long travel distances, spare batteries and offline procedures. Mobile coverage inside process areas may vary, so confirm communications arrangements with the operator.
The organisation runs its own supplier registration and equipment approval, so the decision sits with its procurement and HSE teams. Ask them what evidence they require. The IS-04Z1 has no certificate yet, so share only the datasheet and target marking, and make no claim of approval.
Other guides for Basra Oil Company, other places in Iraq, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.